Home Companies Sinuo Testing Equipment Co. , Limited

IEC 60068-2-14 Three-Box Thermal Shock Test Chamber 300L Environmental Test Chamber

Sinuo Testing Equipment Co. , Limited

Contact Us

[China] country

Trade Verify

Address: Room 101, 1st Floor, No. 6, Third Street, Pingshan Industrial Zone 511495, Shibi Street, Panyu District, Guangzhou, China

Contact name:Zoe Zou

Inquir Now

Sinuo Testing Equipment Co. , Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

IEC 60068-2-14 Three-Box Thermal Shock Test Chamber 300L Environmental Test Chamber

Country/Region china
City & Province guangzhou guangdong
Categories Used Measuring & Analysing Instruments
InquireNow

Product Details

 

IEC 60068-2-14 Three-Box Thermal Shock Test Chamber 300L Environmental Test Chamber


 
Product information:
 

Standard:
1. GB/T 2423.1-2008 Test A: Low temperature test method;
2. GB/T 2423.2-2008 Test B: High temperature test method;
3. GB/T2423.22-2002 Test N: Temperature change test method
4. GJB/150.3-1986 High temperature test
5. GJB/150.4-1986 Low temperature test
6. GJB/150.5-1986 Temperature shock test
7. IEC 60068-2-14—2009 Test N: Temperature change test method
 
Sample description:
This equipment is suitable for two/three temperature zone tests of various temperature shocks and temperature changes within the performance range.
PS: Change the 2-temperature zone or 3-temperature zone test mode in the form of pneumatic damper switching (note that the 2-temperature zone mode has temperature range restrictions)
 
Technical parameters:

 

Volume and size

VolumeAbout 300L
Inner chamber size600×650×750(D×W×H) mm
Outer chamber size2250×2250×2250(D×W×H)mm

Performance

Working method

Pneumatic damper switches between 2 temperature zones or 3 temperature zones

Test chamber impact temperature range

+50℃ to +200℃/-65℃ to -10℃

Preheating temperature range of high temperature chamber

+20℃ to +220℃

Preheating temperature range of low temperature chamber

-75℃ to +10℃

Temperature fluctuation

≤±0.5℃

Temperature deviation

≤±2℃

Temperature uniformity

≤2.0℃

High temperature chamber pre-heating time

+RT℃ to 220℃ for about 60 minutes

Low temperature chamber pre-cooling time

+RT℃ drops to -75℃ for about 90 minutes

Temperature restoration time

≤5 minutes (damper switching time ≤10s)

Test requirements

Supports forward and reverse impact, supports exposure to room temperature for 30 minutes
Energy saving designThe refrigeration system can adjust the power according to the load size, adopts VRF technology based on the PID+PWM principle (the electronic expansion valve is servo-controlled according to the refrigerant flow rate according to the thermal energy working conditions), and has compressor energy adjustment technology, which can achieve excellent energy-saving effects.
Extra long defrost technology

Defrosting technology: 1. Use high-temperature return air from the compressor to defrost the evaporator.
2. The defrost cycle can be set by the user.
3. Automatic/manual can be set at will. Automatic impact and defrost during automatic operation. Impact and defrost control can be manually suspended during operation.

NoiseNoise ≤85dB (measured 1m away from the equipment door by the noise detection device).
Cooling methodThe equipment is water-cooled
 
Structure and materials
 

Outer chamber

Sprayed galvanized color steel plate

Inner chamber

SUS#304 stainless steel plate, corrosion-resistant. All seams are continuously TIG welded to ensure no leakage after long-term testing. Key parts are reinforced to ensure no deformation during long-term use.

Insulation layer

Made of rigid polyurethane foam and glass wool, it is flame-resistant and fire-proof, and meets environmental protection requirements.

Chamber door

Left hinge, right door opening

Sealing

Original imported silicone sealing strip

Switching valves

A. It is divided into high temperature tank, low temperature tank and test tank. The high and low temperature tank is used for energy storage, and the test tank is the user's experimental area.

B. The high and low temperature tank is separated from the test tank by a switchable valve. The corresponding valve will be automatically opened upon impact.
C. There is also an independent ventilation valve, which is activated to introduce ambient air during exhaust (normal temperature recovery).

Test port

There are three test round holes with a diameter of 50mm on the left side of the equipment. The round holes have covers and soft plugs according to user requirements.

Observation window

The door of the box is equipped with a large heating and sweat-proof 3-layer vacuum glass observation window. There is a light in the observation window for observing the conditions inside the test box.

Casters

Four casters with fixed feet

 

Hot Products

IEC 60335-2-84 Cushion Internal Wire Bending Testing Machine Household Appliance Test Product ...
UL 496 Metal Shell Lamp Holder Safety Test Appratus LED Lampholder Testing Equipment Product ...
IEC 60068-2-14 Three-Box Thermal Shock Test Chamber 300L Environmental Test Chamber Product ...
IEC 60529 IP5X/IP6X 24 CBM Walk-In Sand And Dust Test Room Ground Embedded Type Product Information: ...
Rapid Temperature Cycling Test Chamber 800L -70℃~180℃ IEC 60068-2-78 Temperature Test Product ...
IEC60529 IPX6K9K High Pressure And Temperature Water Jetting Test System Waterproof Testing Standard...