Guangzhou Wanxinlong Machinery Trading Co., LTD |
Verified Suppliers
|
|
Excavator Engine Part 3781030 3781029 3773926 Turbocharger For
EC480 EC380 D13D
Product parameters
Type | EC480 EC380 |
Source | Guangdong Province, China (Mainland) |
Type | Turbocharger |
Part number | 65.09100-7040 3539679 |
Guarantee | 6 months |
Minimum order quantity | 1 |
Health Status | new |
Availability | Have the spot |
Supply capacity | 100 a week |
Type 2 | Excavator Pressure Switch, Pressure Sensor, Excavator Accessories,
Excavator Accessories |
Port | Guangzhou/Shenzhen/Hong Kong |
Express | DHL, FEDEX, EMS, UPS |
Payment method | Bank transfer, Western Union, oneyGram, credit cards, PayPal |
The company provides remanufacturing engines, turbochargers,
injectors, hydraulic pumps, swing / walking motors, hydraulic
cylinders, pumps, starters, generators and many other
remanufacturing products.
Remanufacturing is an advanced form of resource cycle, which
interprets one of the core values of "environmental protection".
When purchasing remanufactured parts, users need to return old
parts of the same model. Choose to remanufacture and join hands to
create a beautiful home for sustainable development.
When the equipment fails, replace the remanufacturing components
directly to minimize downtime and maintain productivity.
Remanufacturing parts is a cost-effective solution that can help
rejuvenate your equipment and improve productivity.
It has longer service life and higher reliability than ordinary
maintenance parts. The general overhaul is designed to restore the
performance level of the product before the failure. The quality
standard is low, the life is shortened, and there is a risk of
repeated maintenance.
Compared with the replacement parts, the overall use cost of the
customer is lower. Replacement parts are often cheap but of low
quality, which not only has the risk of repeated maintenance, but
also has an irreversible impact on the life of the whole machine.
At the same time, the loss of downtime may be much greater than the
cost of replacing a new machine.
FAQ
Q1. What is your terms of packing?
A: Generally, we pack you goods use brown or white blank neutral
boxes. If you have legally registered patent, we can pack the goods
in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the
photos of the products and packages before you pay the balance.
Q3: Can i get any discount?
A: Yes, there are 3 ways:
1: Order over 1000 units;
2: Place order with our trailer and other goods;
3: 100% TT advanced payment.
Q4: Is inspection need after final production?
A: No, we has a professional internal QC team to control the
quality within and after final production. The buyer's inspection
is also allowed.
Q5: How long I can get the goods after confirm order?
A: We need 7-30days for production; If you could arrange 100%TT, we
will booking ship advanced, you dont need to wasting time for
waiting delivery.
Q6. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We
can build the molds and fixtures.