Home Companies Daoyunai Energy Saving Technology Limited

Sewers UV CIPP Equipment Pipe Relining Integrated Renovation Mobile System

Daoyunai Energy Saving Technology Limited

Contact Us

[China] country

Trade Verify

Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city

Contact name:Aaron Wang

Inquir Now

Daoyunai Energy Saving Technology Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Sewers UV CIPP Equipment Pipe Relining Integrated Renovation Mobile System

Country/Region china
City & Province shanghai shanghai
Categories Inverters & Converters
InquireNow

Product Details

Integrated Cured-In-Place-Pipe CIPP UV cure renovation mobile system for sewers

 

The integrated UV truck is for underground sewers repair by the Cured-in-Place-Pipe process. Daoyunai, as the OEM and ODM manufacturer, designer, and also supplier, is willing to work together with friends from all over the world to make our home better, our land green, and our waters blue.

 

DAO Company culture:

Vision: build a "green mountains and green waters" unimpeded pipeline, make the world proud made in China

Mission: help customers reduce costs, help customers improve efficiency

Core values: achieve customers: listen to the customer site, change with the customer's needs, etc. respect: respect each other, think with empathy, promote oneself, open up and work together to embrace change

 

The UV curing method is to blow high-pressure gas into the material dragged into the pipe in advance to keep it close to the inner wall of the pipe, and then use the UV curing equipment to continuously irradiate the material with UV light to cure it.

The construction is convenient, and the material can react after being irradiated by light, without preheating.


Materials are put into the pipeline in advance to simplify the construction steps;
The construction is safe. The whole reaction process of materials is carried out in the pipeline without personnel going down the well.
The whole construction process is not affected by seasons and regions.

 

Light Specifications
Diameter rangeDN250-1650
LightHigh Voltage Mercury or LED available, 2 groups of light chains, 8 bulbs.
TemperatureEquipped with two temperature sensors (optical convenience 20:1, measurement accuracy ± 1%)

 

Hot Products

Blowing hose for UV CIPP cure equipment used for trenchless repair sewers Turn on the blower and ...
Integrated Cured-In-Place-Pipe CIPP UV cure renovation mobile system for sewers The integrated UV ...
UV light train for trenchless cure underground pipeline DN200-600 This is used for UV CIPP cured ...
UV cure CIPP equipment specially designed to repair underground sewer pipeline UV Cure Equipment ...
Stainless steel packer for blowing pipe during trenchless CIPP DAO also supplies UV cure system ...
Small diameter sewer repaired by CIPP UV cure product trenchless No-Dig DAO UV cure system is in ...