Home Companies Daoyunai Energy Saving Technology Limited

Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging

Daoyunai Energy Saving Technology Limited

Contact Us

[China] country

Trade Verify

Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city

Contact name:Aaron Wang

Inquir Now

Daoyunai Energy Saving Technology Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging

Country/Region china
City & Province shanghai shanghai
InquireNow

Product Details

UV CIPP (Cured-In-Place-Pipe) manufactured for city pipe repair without digging

Regulations on fixing the bottom film:

 

      The width of the bottom membrane shall be greater than 1/3 of the circumference of the original pipeline, and the length is recommended to be 500mm longer than the original pipeline. If it can be extended to the ground, it is better. The backing membrane shall not be broken and accumulated during the pulling process.

 

      After the bottom membrane is pulled to the end, it shall be fixed firmly with a wooden square and other items and shall be fixed at the opposite nozzle as far as possible to reserve enough space for the following operations.

 

Drag liner material: the material head is locked:

 

      Before the materials are taken out of the wooden box, a cloth about 3M wide and 7-8m long shall be laid on the ground in advance to protect the materials. Place the material on the cloth when taking it out.

1. The material shall be horizontally folded in half to an appropriate width, about one-third, and then vertically folded in half by 50 cm (the length of the longitudinal folding can be adjusted appropriately according to the site conditions).

2. Fold the lifting belt in the middle, and wrap the folded material head with a rope tightener until it cannot fall off (the metal buckle is placed in the middle of the upper part).

 

       And wrap it with adhesive tape.

 

      Finally, link the material pulling rope with the lifting belt with shackles and lock it firmly. If the material is long or large, a universal shaft needs to be added in the middle. (universal shaft must be added when dragging materials with steel wire rope.)

 

 Bottom film 1/3 of the pipe size for protecting
 Liner head Locked
 Key points slowly and carefully

 

 

 

 

 

 

Hot Products

The UV CIPP cure system light rack pulling the rope of high-temperature resistance The reserved rope ...
Blowing hose for UV CIPP cure equipment used for trenchless repair sewers Turn on the blower and ...
Integrated Cured-In-Place-Pipe CIPP UV cure renovation mobile system for sewers The integrated UV ...
UV light train for trenchless cure underground pipeline DN200-600 This is used for UV CIPP cured ...
UV cure CIPP equipment specially designed to repair underground sewer pipeline UV Cure Equipment ...
Stainless steel packer for blowing pipe during trenchless CIPP DAO also supplies UV cure system ...