Home Companies Shenzhen Mingyang Digital Technology Co.,Ltd

Pvc Banner Welder Leister Varimat V2 V1 , Heat Welding Vinyl Fabric Machine

Shenzhen Mingyang Digital Technology Co.,Ltd
Active Member

Contact Us

[China] country

Address: Room707, Jude Commercial Building, South Zhengfeng Road, Fuyong town, Baoan District, Shenzhen, Guangdong, China

Contact name:Alan Chang

Inquir Now

Shenzhen Mingyang Digital Technology Co.,Ltd

Pvc Banner Welder Leister Varimat V2 V1 , Heat Welding Vinyl Fabric Machine

Country/Region china
City & Province shenzhen guangdong
Categories Plastic Welders
InquireNow

Product Details

 

50-60HZ Tent hot air Welding Machine VARIMAT V2 / V1 With Leister Hot Air Gun

 

 

    We are a Professional Export Trade Company . Sale many kinds of Machine and materials about the Advertising Industry .

 

About The Leister air welding TOP 2000 B , details as below :

 

Specification:

Machine model Top 2000 B
Welder air gun Leister hot air gun
Welder Warranty One year
Welding width 2-4 cm
Welding thickness 0.22-2mm
Welding temperature400 degree ( normal )
Welding power 1000-3000W
Welding Voltage 110 V/220 V
Welding Frequency 50-60 HZ
Welding Speed 1-15m/min
Machine wheel Aluminum wheel

 


 

Operation Step :

 

 

 1. Make the cloth for seaming flat and put it underneath.Fix both ends by adhesive tape or something else.

 

 2.The overlap width of the two pieces is about 3-mm, the width of the nozzle of hot seaming machine.

 

 3.Put the machine nozzle between two overlap pieces.The press-wheel should be at left side of nozzle.The nozzle also need align with side of upper piece of cloth.

 

 4. Switch on the motor power and then adjust speed.

 

 5.Turn on the movement switch.

 

 6.Press heating power key to adjust temperature.

 

 7.Turn the bar by anticlockwise to fix the position to startup automatic movement.The machine will go along with the overlap path by itself.

 

 8.Turn the bar by clockwise to cease the automatic work.

 

 9.The operator should control the moving direction and make sure the nozzle connect both with upper and under piece of cloth

 


Moving,Dismantlement,Installation,Cleaning:

 

Any part of this machine being bumped of fallen can cause some damage impossible to be repaired.So please pay attention to carry it.It is suggested to move the machine by manpower and put it down carefully

 

The place for installation must be flat and the floor is strong enough to support the machine and moreover, the installation place should close to power supply

 

Please check if there is damage or missed parts after unpack the machine.Any problem, please contact us or the local agent immediately

 

Please sweep away the anti-rust oil from the machine with detergent and re-lubricate with light lubricating oil after installation

 

Keep the installation place no dust and avoiding sunshine

 


 

General instruction for safety :


 

Keep the working place clean. Messing up and the disorderly working place cause disaster

 

Choose the work place carefully and use the machine in a bright and dry circumstance.

 

For safety and the long life of the machine, please do not let the machine operates overtime.

 

The electricity, controlling box and protective facilities have to be in the proper order after finishing daily work. The electrical power supply has to be switched off definitely.

 

The machine has to be stopped before gets maintenance or replacing the parts.

 

Use standard or indicated tools when dismantling or replacing parts.

 

If any special incidents happened, please stop the machine first for repairing, And do not deal with the special incident with improper procedures.

 

If the machine is operated on land, keep the work place clean and no dust there. If dust or something blocks the inhaling filter of heater, the heating wind can not come cut adequately and then temperature inside of filter will rise to let the heater burn down.

 

Operation Notice :


 

 - During operating, if the surface cloth is dissolved and scorched or the cloth are not sticked together, please stop to adjust the temperature or speed.

 

 - During operating,if the seaming part is not in right position, please stop to adjust fixing position.

 

 - Adjust temperature to zero before turn off the heater.Switch off after 5-10 minutes

 

 - During operating, make sure clothes are flat so that stick together smoothly.

 

 -The hot wind of heater cannot touch the press-wheel or the rubber of press-wheel is easy to be burned down.

 

 

Connecting the power supply:


 

Connecting the electric wire to the reserved plug(AC220V)of controlling box.

 

 

Maintenance:


 

Take care the nozzle.Use brush to clean if there is dust or block in the nozzle or filter.

 

 

 

FAQ : 

 

1. Q : What is the use of the machine ?

 

A : Use hot air to make the PVC Banner welding together

 

2. Q : What kinds of materials can it welding ?

 

A : It can welding PVC / Banner / Flex and other outdoor materials can be hot melt

 

3. Q : What's the machine work type ?

 

A : It's Automatic welding

 

 

4. Q : Which kinds of hot air gun it use ?

 

A : Leister hot air gun

 

5. Q : How long is the warranty period?

 

A : The Warranty is one year

 

6. Q : What's the MOQ ?

 

A :  The MOQ is One set of Welding machine

 

 

Thanks for your kindly Reading ! Any questions Please contact me !

 

 

Hot Products

1600W Hot Air Vinyl Seaming Machine / Welding Machine For Banner / Heat Welding Machine Product ...
2000W Hot Air Seaming Machine / Heat Welding Machine Product Description : When picture size more ...
15m/min Speed Portable Heat Seaming Machine / Welding Machine For Banner This Machine is designed ...
110V / 220V AUTO Welding Machine For Banner / Heat Welding Machine / Plastic Welding Machine Machine ...
50-60HZ Tent hot air Welding Machine VARIMAT V2 / V1 With Leister Hot Air Gun We are a Professional ...
3600W Automatic Plastic Welding Machine / PVC Hot Air Welder For Sale Product Description : The ...