Home Companies Guangzhou Kinte Electric Industrial Co., LTD

JMC Project/BIW Engineering

Guangzhou Kinte Electric Industrial Co., LTD

Contact Us

[China] country

Trade Verify

Address: No.16 Yufeng Road Shiling Town Huadu District Guangzhou, China

Contact name:Alex

Inquir Now

Guangzhou Kinte Electric Industrial Co., LTD

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

JMC Project/BIW Engineering

Country/Region china
City & Province guangzhou
InquireNow

Product Details

JMC project

 

 

1. Project name

JMC project

2. Project time

2018.6

3. Project introduction

Models: 4 models collinear

Capacity: 33JPH

Robot: KUKA

Quantity: 77 units

Model switching form: turntable, turn hub

4. Core technology

1. Four-model flexible production line

2. Core equipment such as FDS, seven-axis, APC, turntable, and hub

3. Robot automatic arc welding, robot gluing visual inspection, etc.

 

 

 

Analysis on the structure and working principle of the transmission device of the automobile welding production line

The following takes the transmission device of the automobile side panel assembly line as an example to analyze its structure and working principle in detail

The transmission device of the side panel assembly line of a certain vehicle type adopts a four-station reciprocating rod device, which can realize horizontal and vertical movement. The structure and function analysis of each sub-assembly is as follows:

 

1. Drive unit

Working principle: The motor drives the two gears to rotate through the coupling, and the two gears respectively drive the moving skateboard to move through the parallel racks meshing with it, thereby driving the body side panel mounted on the moving skateboard to move horizontally.

 

2. Synchronous rack device and jacking device

Working principle: The cylinder drives the "active gear" in the jacking device to rotate through the "active cylindrical gear bar", thereby driving the "driven cylindrical gear bar" to move, and indirectly pushing the "jacking frame" to move up and down, realizing the horizontal movement to The conversion of the vertical movement achieves the purpose of freely lifting the side panel of the vehicle body. In addition, the part 6 (support guide cylinder) in the synchronous rack device mainly plays the role of guiding and ensuring that the active cylindrical gear bar is always meshed with the driving gear in the jacking device; part 5 (anti-rotation angle iron) mainly plays the role of preventing the active cylindrical gear The role of the gear bar rotation. Part 1 (auxiliary thrust cylinder) in the jacking device mainly plays the role of equalizing vertical motion thrust.

Hot Products

Automatic welding workstation for battery case assembly The Intelligent Equipment Division is ...
M4 Automotive underbody sub-assembly welding work island Case highlights: 1. Renovation of existing ...
KX11 model M2 stage test paper fixture development project 1. Project name KX11 model M2 stage test ...
Longitudinal beam assembly automatic welding workstation The Intelligent Equipment Division is ...
JMC project 1. Project name JMC project 2. Project time 2018.6 3. Project introduction Models: 4 ...
Automotive hemming project Project introduction: A car front cover piping project, 30JPH, 2 robots ...