Ningbo Tian'an Jinghua Power Technology Co., Ltd. |
|
XGTD5-(12,24)40.5 Indoor Gas Insulation Metal-Clad High Voltage Switchgear
Service conditions
a. Ambient temperature: -25℃~+40℃the daily average value shall not exceed 35 ℃
b. Altitude: Not more than 5000m above the sea level
c. Relative humidity: Daily average is not more than 95%,
Monthly average is not more than 90%
d. Seismic grade: the seismic intensity shall not exceed grade 8
e. Inductive electromagnetic interference value of secondary system: not more than 1.6KV
Note: if the service environment exceeds the above conditions, please consult with our company
The characteristic of structure
Whole switchgear
C-GIS applies to all 3-35 kV single or double bus power system, according to the function, it can be divided into input cable panel, output cable panel, bus connection panel, PT panel and measuring panel. It also has flexible combination configurations a according to user requirements of primary main wiring. Side expanding or top expanding bus connection will be adopted between panels. Input and output cable can use 2 #, 3 # cone socket inside or outside the cone sleeve connection. Insulation parts are standard, with high expansibility and compatibility. High voltage components such as transformer, lightning arrester have diversified installation types, which can greatly satisfy the requirement of users.
Installation and splicing
The installation foundation construction of C-GIS switchgear shall comply with the relevant provisions in the DL/T5190 technical code for construction and acceptance of electric power construction, and shall be constructed according to the appearance and installation foundation dimensions of the switchgear. The installation foundation drawing and installation splicing diagram of the switchgear are shown below. (Note: If the secondary cables enter the panel from the top, it can be free from equipping the secondary cable hole and cable channel.
Service
1. Installation Guide
We will provide online or on-site guidance if it is neccessary when install equipments, so that we can try our best to help you on the problem you meet.
2. Maintance and Problem-Solving
Online and on-site guidance could be given for manitaining or solving some problems of the equipment. Some spare parts could be sent there if neccessary.
3. Technical Support
Other technical support could be provided if neccessary.