Home Companies Jiangsu Lebron Machinery Technology Co., Ltd.

Soncap 20m/Min Metal Stud Roll Forming Machine 70mm Shaft

Jiangsu Lebron Machinery Technology Co., Ltd.
Active Member

Contact Us

[China] country

Address: 1604#, Yangming Sicence & Technology Industry Center, No.855 Nanhu Avenue,Wuxi city, Jiangsu, China

Contact name:Alfred

Inquir Now

Jiangsu Lebron Machinery Technology Co., Ltd.

Soncap 20m/Min Metal Stud Roll Forming Machine 70mm Shaft

Country/Region china
City & Province wuxi jiangsu
InquireNow

Product Details

Full Automatic High-Speed Stud And Track Forming Machine Steel Construction Usage

 

 

1. Description:

 

Steel Stud and Track Roll forming machines are very popular in the metal base industry, therefore, we provide you with stud and track roll forming machines. This type of roll forming machine is very popular in the metal industrial construction of metal or metal profiles. The construction of the metal industry has always been popular because we have created efficiency for running the metal industry, so we have provided this equipment.

 

Provide the best stud and track roll forming machine at a reasonable price

 

 

2. Main Technical Parameters

 

No.ItemDescription
1Main Power5.5KW
2Drive SystemChain
3Roll Forming Speedover 20m/min
4Roller Station12 stations
5Roller Material45# steel, quenched. Coated with 0.05mm chrome
6Shaft Material45# steel, quenched, coated with 0.05mm chrome
7Shaft diameter70mm

 

 

3. Workflow:

 

Uncoiling → Feeding & Guiding → Roll Forming → Hydraulic Punching → Servo Tracking Cutting → Receiving

 

 

4. Main Components

 

No.NameQuantity
13-Ton Decoiler1 Set
2Feeding Guider1 Set
3Roll Forming Machine Unit1 Set
4Hydraulic Punching Device1 Set
5Hydraulic Servo Tracking Cutting Device1 Set
6Hydraulic Station1 Set
7Receiving Table1 Set
8Electric Control Cabinet1 Set

 

 

5. Brands of Electrical Appliances

 

No.Name & BrandBrand
1PLCGermany Siemens
2Frequency ConverterJapan Yaskawa
3Touch ScreenGermany Siemens
4EncoderJapan Omron
5Other Electrical AccessoriesFrance Schneider

 

 

6. After-Sale Service

 

After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.

 

The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.

 

The buyer should arrange the accommodation, food, and traffic in the destination

 

Training period: 2 days. (we can supply training on the operation spot if buyer needs)

 

Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.

 

 

 

 

 

 

Hot Products

Over 30 Meters Per Minute High-Speed Stud And Track Forming Machine Full Automatic 1. Description: ...
Full Automatic High-Speed Stud And Track Forming Machine Steel Construction Usage 1. Description: ...
Steel Building Materials Steel Stud And Track Forming Machine Steel Framing Machine 1. Description: ...
High-Speed High-Efficiency Steel Stud And Track Roll Forming Machine PLC Controlled 1. Description: ...
Siemens PLC Controlled High-Speed Steel Stud And Track Roll Forming Machine 1. Description of stud ...
Omron Encoder Siemens PLC High-Efficiency Steel Stud And Track Roll Forming Machine 1. Description ...