Jiangsu Lebron Machinery Technology Co., Ltd. |
|
High-Speed High-Efficiency Steel Stud And Track Roll Forming Machine PLC Controlled
1. Description:
The stud and track roll forming machine can roll forms steel stud and track members for use in wall, floor and truss framing. The standard machine produces stud & track members from 3 5/8″ (92.1mm) to 8″ (203.2mm) widths and 26 gauge to 14 gauge steel.
It has the features as follows:
High Efficiency
Production speed: 20/min.
9600m per shift one day (8 hours).
Automatic & Easy Operate
High Accuracy
The shaft material is No. 45 steel. The diameter is 55mm. The shafts are tooled by a grinding machine 2 times. It’s strong and durable. Ensure product accuracy.
Automatic Operation: once you set the quantity and length of the product, the machine will produce the product automatically.
Mitsubishi PLC with the touchscreen. Friendly man-machine interaction. The system is simple to learn and easy to operate.
Simple to install and easy to maintain.
You only need to connect some tubes and wires in your factory. Video and manual will show you how to do it.
Long service life
Roller material is high-grade No.45 forged steel, plated with hard chrome, processed by digital-controlled procession.
2. Main Technical Parameters
Suitable material | GI strip and CR strip |
The thickness of raw material | 0.5-0.6mm (235-345Mpa) |
Material of rollers | 45# steel being quenched treatment |
Cutter blade& punching die material | Cr12 mold steel with quenched treatment, HRC58-60 |
Power Requirement | Main motor power: 4Kw |
Hydraulic station power: 4Kw | |
Material of shaft | High quality 45# steel, with heat treatment. |
Forming speed | About 20m/min |
Shaft diameter | dia 55mm |
Controlling system | Mitsubishi PLC & converter |
Quantity of rollers | About 15 stations |
Total weight of the machine | About 4000KGS |
Machine's size | About 3.5m×1.7m× 1.4m |
4. Main Components
Name | Quantity |
Uncoiler | 1set |
Coil sheet guiding device | 1set |
Main roll forming system | 1set |
Punching device | 1set |
Cutting device | 1set |
Hydraulic station | 1set |
PLC control system | 1set |
Support table | 2sets |
5. After Sale FAQ:
1). Q: How to acquire service support?
A: Lebron-Machinery is doing its best to provide timely and convenient service support for the customers, the contents of services including: before-sale technical counseling, field installation, operate technical training, application solution training and troubleshooting support, etc. You can gain service support from our distributors in your region.
2). Q: After purchase Lebron-Machinery’s machine, what kind of training could Lebron-Machinery provide?
A: Lebron-Machinery will provide 7 days’ free field training. The training place can be in Lebron-Machinery company or in places designated by customers where installation takes place, this can all be predetermined by clients in the contract.
3). Q: What kind of warranty does Lebron-Machinery’s gutter machine provide?
A: Except for the consumables, the whole machine has a one-year limited warranty.
4). Q: After buying Lebron-Machinery’s equipment, is there a technician in charge of supporting on-site installation?
A: Yes, if the equipment is directly sold from Lebron-Machinery, we will arrange experienced technicians to support the installation and collaboration when the machine arrives. If the device is sold by Lebron-Machinery’s distributors, LBM will authorize them to send experienced engineers to support the installation and collaboration when the machine arrives. Except the contract made other agreement for the installation.