Product Description
The system can accurately test output power and load capacity with
all kinds of generators. System consists of testing/control and
load bank, mainly includes AC load bank, data capture system, auto
load/unload control system, heat dissipation device, assist control
and PC software. User can control load bank through local control
panel, also through software.
Technical Parameters
Rating Voltage/Frequency | 400VAC/50Hz, 3 phase 4 wire, |
Rated Load Power | Resistive load: 600kW |
Installed Capacity | Resistive load: 600kW |
Load Step | 1,2,2,5,10,10,20,50,100,200,200kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 380VAC/50Hz, 3 phase 4 wire, |
Wire Connection | Load power supply input——busbar |
Insulation | F |
Duty Cycle | Continuous |
Casing Dimensions and Cooling | about 1550*1250*1680mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air |
Weight | About 750kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
1.Control Mode: local, remote or intelligent control(software) for
choosing.
2.Local Control: local control panel with several power steps, load
or unload by switch on-off and read parameter values from measuring
meter.
Application
1.Manufacturers of standby power generators commonly use load banks
to test and tune newly assembled units
2.generator has been set up in a test cell within the factory, a
test engineer uses the load bank to apply a discrete, selectable
electrical load to the generator and measure the response stability
and endurance.
3.During this process, the test engineer calibrates and adjusts the
generator performance to ensure it meets the intended product
specifications and tolerances.