Guangzhou Tengsong Construction Machinery Equipment Co., Ltd |
Verified Suppliers
|
|
4LE2 Engine Overhaul Gasket Kit 5-87814313-1
part number: | 5-87814313-1 |
For models: | 4LE2 |
weight | 1.5KG |
Warranty period: | 1 year |
Quality: | high quality low price long life |
Gasket kit care introduction
For 4LE2 engine gasket kit maintenance, here are some suggestions:
1. Periodic Inspections: Periodically inspect the condition of the
gasket kit, especially at the inspection points specified in the
engine maintenance schedule. Pay attention to whether there are oil
leaks, coolant leaks or other abnormal signs.
2. Replacement cycle: Replace the gasket set regularly according to
the manufacturer's recommendations and usage conditions. Typically,
gasket kit replacement intervals should follow those specified in
the engine maintenance manual.
3. Use the right material: When replacing a gasket set, be sure to
choose a gasket of the right material that meets the manufacturer's
requirements. Use a quality original or certified gasket kit to
ensure tightness and reliability.
4. Proper lubrication: If the gasket kit requires lubricant or
sealant, follow the manufacturer's recommendations. Be sure to use
the appropriate lubricant and adhere to the specified application
thickness and method.
5. Pay attention to temperature and pressure: The gasket kit works
in a high-temperature and high-pressure environment, so ensure that
the engine is running properly and that the temperature and
pressure are controlled within the design range. Excessive
temperatures and pressures can cause gasket failure or damage.
6. Maintain coolant and engine oil well: Check and replace coolant
and engine oil regularly to ensure that their quality and
performance meet requirements. Proper cooling and lubrication can
reduce the workload on the gasket kit and extend its service life.
Gasket Kit Installation Instructions
Installing the 4LE2 engine gasket kit requires certain professional
knowledge and skills. The following are the general installation
steps for reference:
1. Preparation: Make sure you have the appropriate safety measures
and tools, and consult the relevant engine service manual for
detailed installation instructions before proceeding.
2. Removal of old gaskets: First, completely remove the old
gaskets. Using the appropriate tools and cleaner, carefully remove
the old gasket and residue completely to ensure a good seal when
installing the new gasket.
3. Prepare a new gasket kit: Make sure you have obtained the
correct model and specification gasket kit for your 4LE2 engine.
Carefully inspect the new gasket for integrity and quality, and
pre-apply the appropriate lubricant or sealant (if required)
according to the manufacturer's recommendations.
4. Install the gasket kit: Follow the instructions in the engine
service manual and install the new gaskets onto the corresponding
components one by one. Make sure the gaskets are properly aligned
and tightened according to the manufacturer's recommended torque
values and sequence.
5. Inspection and Adjustment: After installing the gasket kit,
carefully check the condition and tightening force of all
fasteners. Make sure the gaskets are installed correctly and
nothing is loose or improperly installed.
6. Installation of other components: If necessary, install other
related engine components such as cylinder head, crankcase, etc.
back into place, and follow the manufacturer's instructions for
correct installation and tightening.
7. Final inspection: After completing all installation steps,
perform a final inspection. Make sure the gasket kit is installed
correctly, that all fasteners have been tightened correctly to
specifications, and that there are no leaks or abnormalities.
Company Profile