Home Companies Henan Dowell Crane Co., Ltd.

Electric Overhead Crane 5-15M/Min Lifting Speed For Indoor Storage Place

Henan Dowell Crane Co., Ltd.
Active Member

Contact Us

[China] country

Address: Economic Development Area, XinXiang city, Henan province, China.

Contact name:June Chao

Inquir Now

Henan Dowell Crane Co., Ltd.

Electric Overhead Crane 5-15M/Min Lifting Speed For Indoor Storage Place

Country/Region china
City & Province xinxiang henan
InquireNow

Product Details

New Technology Electric Overhead Crane For Indoor Storage Place

 

Product Description

 

New Technology Electric Overhead Crane For Indoor Storage Place is composed with Girder frame, Crane travel device, and the trolley with lifting and moving device. There are pave the rail for the trolley move on the main girder. Assemble the moving table on the outside of the two main girder, one side is prepare for the assemble and maintenance the crane move device, another side is prepare for the assemble of the trolley conductor device.

 

 

 

 

Package & Delivery

 

 

 

Matters Needing Attention

 

In the operation process of bridge crane, its control system plays a crucial role, in addition to the common CAM controller control and master command controller control these two control forms, bridge crane also successfully realized automatic control, thus improving the performance of each action.
The automatic control system of bridge crane includes the automatic control of programmable logic controller, the control of automatic positioning device, the rectification and electrical synchronization of vehicle operating mechanism, the electromagnet and its control circuit, and the ground control.
The operation of each mechanism of bridge crane depends on the program control device. While its automatic positioning is generally determined according to the operating environment and accuracy requirements of the controlled object. The automatic positioning device usually USES various detection components to cooperate with relays, contactors or programmable controllers to achieve the purpose of automatic positioning.
The deviation correction and electrical synchronization of the operating mechanism of the truck in the bridge crane are divided into artificial deviation correction and automatic deviation correction. When the deviation correction exceeds a certain value, the signal generator will send a signal, and the driver will disconnect the motor on the side of the leading leg and connect the motor on the side of the lagging leg for adjustment. When the deviation exceeds a certain value, the deviation correction instruction generator will issue an instruction and the system will automatically correct the deviation. Electrical synchronization is in the ac drive, usually with a balanced motor shaft system to achieve electrical synchronization.
Some cranes use ground control, the key component is the manual button switch, the cable remote control is through a special cable or power line as the carrier body, the signal with a modem transmission mode, to achieve only a few channels can achieve control method. Wireless remote control USES modern electronic technology to transmit information in the form of radio waves or light waves to achieve the purpose of control.

 

Parts Of Crane

 

 

Hot Products

New Technology Electric Overhead Crane For Indoor Storage Place Product Description New Technology ...
Steel Plant 50 Ton Cabin Double Girder Overhead Bridge Crane With Trolley Product Description Steel ...
Double Girder Rail Traveling Electric Gantry Cranes With Trolley Product Description Double Girder ...
20 Ton Running Remote Control Double Beams Overhead Crane With Trolley Product Description 20 Ton ...
150 Ton Durable Double Girder Cast Bridge Crane Foundry Equipment Product Description 150 Ton ...
European Standard Advanced Design Single Girder Bridge Crane Product Description Single-beam ...