Home Companies GUANGDONG RUIHUI INTELLIGENT TECHNOLOGY CO., LTD.

Hardware Auto Parts Processing Steel Coil Uncoiler Stamping And Leveling Machine

GUANGDONG RUIHUI INTELLIGENT TECHNOLOGY CO., LTD.
Active Member

Contact Us

[China] country

Address: No. 12, Chuangxing Road, Baisha, Humen Town, Dongguan, Guangdong, China

Contact name:Calin Deng

Inquir Now

GUANGDONG RUIHUI INTELLIGENT TECHNOLOGY CO., LTD.

Hardware Auto Parts Processing Steel Coil Uncoiler Stamping And Leveling Machine

Country/Region china
City & Province dongguan guangdong
InquireNow

Product Details

 

Hardware Auto Parts Processing Steel Coil Uncoiler Stamping And Leveling Machine

 

Heavy-duty material racks are mainly used for unwinding of heavy-duty coils. They are often referred to as heavy-duty uncoilers. They have two types of power and power. The unpowered heavy-duty material rack itself has no power. Adjust the tightness of the tape.

 

Although the required waiting area is short, the pulling force must be provided by the subsequent leveling machine, which usually affects the stability and service life of the leveling machine. Therefore, it is used less and less in the press line, and the power heavy material frame becomes The mainstream of the industry's discharge equipment.

 

1. Before loading the heavy material rack, it is necessary to check the loading equipment (driving, forklift) to ensure the safety of the loading equipment. Pay special attention to the use of old or faulty loading equipment for heavy material racks. Carry out the loading.

 

2. Check the weight, inner diameter, outer diameter, thickness and width of the coil. Do not use coils that exceed the range of heavy-duty material racks to avoid damage to the machine.

 

3. Ensure that the material roll is tied with the material before the material tray is placed in the material holder, so as to avoid the personal safety accident caused by the sudden unwinding of the roll.

 

4. During the loading of heavy material racks, it is necessary to draw a forbidden zone to prevent non-operators from entering the danger zone.

 

5. Always cut off the power supply of the material frame before loading. After the loading is completed, the handle handle should be removed immediately. After the inspection is correct, the power can be energized. After the power is turned on, the material holder is prohibited from standing around the tile.

 

6. The A-type iron installed on the diagonal of the heavy-duty material frame must be locked and kept at a gap of 2-5mm from the edge of the material roll to reduce the roll and the support tile while ensuring the normal discharge of the material frame. The relative range of motion between.

 

products:

material rack

material rack

 

specifications

ModelStock Width (mm)Coil Weight (kg)Motor
(kw)
Pressing ArmCoiling block expansion modeMaterial ID (mm)Material OD (mm)
ME-20070-2005000.375PneumaticManual/Hydraulic508930
ME-30070-3008000.75PneumaticManual508930
ME-40070-40010000.75PneumaticManual/Hydraulic508930
ME-50070-50015001.5PneumaticManual5081200
ME-600100-60030001.5PneumaticManual5081200
ME-800100-80050002.2PneumaticManual5081200
 

 

FAQ:

Q1:What kinds of machines do you have?
Our main products are:Nc Servo Roll Feeder,Uncoiler, Straightener, 3 in1 Straightener Feeder,Transfer systems,Press Feeding Line., etc
Q2:Is your equipment standard or customized?
Both, we can OEM & ODM with customers.
Q3:What are your equipments certification?
All our items are coming with CE certifications.
Q4:How did your company's quality system work?
"QUALITY IS OUR CULTURE" Our quality is not the best in the world, and the price is not the cheapest. But we can provide you excellent products to defeat your competitors.
Q5:How long is the warranty period of the machine?
We offer free service with a warranty period of one year, If it is operate in reasonable, the machine can be used more than 10 years.
Q6: Is it possible to be a foreign agent and distributor?
If you are confidence and excellent service for after-sales, then welcome to be our agents or distributors all over the world.
Q7:What's your payment?
T/T,D/P,L/C,Western Union., etc
Q8:What's the delivery?
"TIME IS GOLD" for you and for us, so we have professional team work and production line can make nice quality in short time.

 

1. Pre-Sales Service:We have professional designers to meet the different requirement of our customers.
2. After-Sales service:We have an efficient team to meet 24*7 all day service.
3. Full-Service:Actively cooperate with customers to deal with problems in equipment using.
4. Engineers can provide service machinery overseas.

Hot Products

Stamping Automation Metal Sheet Straightening Machine Hardware Auto Parts Processing Heavy-duty ...
Roller Feeder Metal Sheet Straightening Machine Material Rack Production Anyone who often uses the ...
Pneumatic feeder, stainless steel coil stamping, Ruihui feeding equipment processing The standard ...
Automatic NC Feeder Equipment , Metal Sheet Straightening Machine Ss Wafer Processing Yaw NC feeder ...
Automation Metal Straightener Equipment Heavy Duty Material Frame Wafer Stamping Processing As the ...
Unwinding stamping, spring splint stamping, Guangdong Ruihui Feeder Heavy-duty material frame, which ...