Home Companies Guangzhou Kinte Electric Industrial Co., LTD

Main Line/BIW Engineering

Guangzhou Kinte Electric Industrial Co., LTD

Contact Us

[China] country

Trade Verify

Address: No.16 Yufeng Road Shiling Town Huadu District Guangzhou, China

Contact name:Alex

Inquir Now

Guangzhou Kinte Electric Industrial Co., LTD

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Main Line/BIW Engineering

Country/Region china
City & Province guangzhou
Categories Nail File
InquireNow

Product Details

MAIN LINE

 

Product Introduction

1. High-speed roller bed trolley transportation reduces non-process time and improves the utilization rate of process equipment

2. The windmill switching mechanism realizes the flexible switching of trolleys, and can realize random switching of 4 platforms, and the model introduction is convenient and fast

3. The standard flexible assembly system realizes random switching, and the line body width of 4 models is 18m

4. The main line and repair welding line use the form of in-line circulation to reduce the number of returned empty trolleys and reduce the number of second-story steel platforms

5. Including side wall pre-assembly, general assembly, top cover parts, laser, wheel cover piping, arc welding, repair welding, punching, online inspection and other modules

6. According to the product process, select the appropriate module to quickly generate the plan and corresponding process documents

 

 

The main line is the main welding and assembly line of the body in white. The assembly station of the production line will complete the assembly of the floor assembly and the side wall assembly and the top cover beam, and complete the connection of the top cover, rear wall and side wall at the other stations. Assembling and welding of multiple parts such as panels, a traditional body-in-white is formed on this production line.

 

The main station of the main line is the assembly station, which is also the most important station in the entire welding workshop. The assembly station is transported by robots, transported by slide rails, or combined to form a general tooling, The positioning of the fixture is fixed.

 

Features

The standardized and flexible production of the assembly station can realize the free switching of multiple models.

 

The fixtures and fixtures of the main line have a high repetition rate and are modularized.

 

Roller bed conveying, does not occupy the non-technical beat, and the equipment utilization rate is high.

Hot Products

ZB20012-JAC new generation light truck 2090 wide cab basic project welding line renovation and new ...
Chery Kaifeng Plant 30JPH Capacity Improvement Project 1. Project name: Chery Kaifeng Plant 30JPH ...
STANDARD ELECTRONIC CONTROLLING SYSTEM AND PROGRAM GENERATION SYSTEM PRODUCT INTRODUCTION Standard ...
Main Welding Line Main welding line of the vehicle body is composed of frame, engine cover, trunk ...
MAIN LINE Product Introduction 1. High-speed roller bed trolley transportation reduces non-process ...
Electrical Control System The spray booth is a device that provides a special environment for ...