Home Companies Ruixin Energy Equipmnet

Double Ram BOP 5K Pressure Control Wireline Preventer Manual Type

Ruixin Energy Equipmnet

Contact Us

[China] country

Trade Verify

Address: Room 1901, Block A, Saigao District Building, Feng Cheng Five Road, Xi 'an Economic and Technological Development Zone, Shaanxi Province

Contact name:Selina Qiang

Inquir Now

Ruixin Energy Equipmnet

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Double Ram BOP 5K Pressure Control Wireline Preventer Manual Type

Country/Region china
City & Province baoji Shaanxi
Categories Pressure Switches
InquireNow

Product Details

                               Double Ram BOP 5K Wireline Pressure Control Preventer

 

I. Introduction

A BOP (Blowout Preventer) is connected with the top of either wellhead adapter or Christmas tree. Annular

space around wireline or slickline will be sealed by closing lubricator valve when the wireline or slickline is

still in the hole. Then the pressure in the well will be sealed to prevent blowout. Single ram BOP is usually

used for wireline and double ram BOP is for wire stick accordingly. Three ram BOP (with shear ram) is also

available. Max. work pressure is up to 105MPa (15,000PSI). BOP for standard and H2S services are both

available with manual or hydraulic control methods.

 

Model

Work Pressure

Bore

Wireline / Slickline OD.

Control Method

Remarks

FZ6.3-35

5000PSI

63.5mm

0.125"

Manual/ Hydraulic

Single

Ram

2FZ6.3-35

5000PSI

63.5mm

7/32"

Hydraulic

Double Ram

FZ7.6-35

5000PSI

76.2mm

0.125"

Manual/ Hydraulic

Single Ram

2FZ7.6-35

5000PSI

76.2mm

7/32"

Hydraulic

Double Ram

FZ10.2-35

5000PSI

102mm

0.125"

Manual/ Hydraulic

Single Ram

2FZ10.2-35

5000PSI

102mm

7/32"

Hydraulic

Double Ram

FZ6.3-70

10000PSI

63.5mm

0.125"

Hydraulic

Single Ram

2FZ6.3-70

10000PSI

63.5mm

7/32"

Hydraulic

Double Ram

FZ7.6-70

10000PSI

76.2mm

0.125"

Hydraulic

Single Ram

2FZ7.6-70

10000PSI

76.2mm

7/32"

Hydraulic

Double Ram

FZ10.2-70

10000PSI

102mm

0.125"

Hydraulic

Single Ram

2FZ10.2-70

10000PSI

102mm

7/32"

Hydraulic

Double Ram

FZ6.3-105

15000PSI

63.5mm

0.125"

Hydraulic

Single Ram

2FZ6.3-105

15000PSI

63.5mm

7/32"

Hydraulic

Double Ram

FZ7.6-105

15000PSI

76.2mm

0.125"

Hydraulic

Single Ram

2FZ7.6-105

15000PSI

76.2mm

7/32"

Hydraulic

Double Ram

FZ10.2-105

15000PSI

102mm

0.125"

Hydraulic

Single Ram

2FZ10.2-105

15000PSI

102mm

7/32"

Hydraulic

Double Ram

 

III. Structure Characteristics

The BOP consists of body, ram assembly, equalizing valve, end cap, stem, handle, O ring, etc.

 

IV. Operation Procedure

1. Installation

1.1 Close the wellhead valve. Clean the seal bore of wellhead adapter. Then install it.

1.2 Install the lubricator or other device in to the top of BOP.

2. Open

2.1 Open the valve plug of equalizing valve with allen wrench.

2.2 After the pressure is equalized, rotate the handle anticlockwise. Then ram will be opened.

2.3 Close the equalizing valve.

3. Close.

Rotate the handle clockwise. Then ram will be closed.

 

IV. Maintenance

1. Disassemble BOP after operation and clean the parts. Check the sealing-face or seal parts carefully.

Replace the worn parts in time.

2. After each disassembly, it is a must to conduct the seal test.

3. Strength test must be conducted on time.

Welcome to contact us at any time.

Hot Products

Double Ram BOP 5K Wireline Pressure Control Preventer I. Introduction A BOP (Blowout Preventer) is ...
Tool Trap Wireline Pressure Control Equipment I. Product brief description: Anti-drop device, also ...
Quick Test Sub 5K Wireline Pressure Control Equipment Ⅰ. Introduction The Quick Test Sub is designed ...
Wireline Pressure Control Wireline Hay Pulley I. Introduction: The ground pulley is used to pull the ...
Wellhead Joint Wireline Pressure Control Equipment I. Overview The wellhead joint is used to connect ...
Alloy Steel Slickline Wireline Chemical Injection Sub Liquid Chamber Ⅰ. Introduction Chemical ...