Home Companies Ruixin Energy Equipmnet

5K 10K Wireline Tee joint Wireline Pressure Control Equipment H2S Standard

Ruixin Energy Equipmnet

Contact Us

[China] country

Trade Verify

Address: Room 1901, Block A, Saigao District Building, Feng Cheng Five Road, Xi 'an Economic and Technological Development Zone, Shaanxi Province

Contact name:Selina Qiang

Inquir Now

Ruixin Energy Equipmnet

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

5K 10K Wireline Tee joint Wireline Pressure Control Equipment H2S Standard

Country/Region china
City & Province baoji Shaanxi
Categories Pressure Switches
InquireNow

Product Details

5K 10K Wireline Tee joint Wireline Pressure Control Equipment H2S Standard

 

5K 10K Wireline Tee joint Wireline Pressure Control Equipment

Ⅰ. Introduction
The Wireline
Tee joint is attached below the BOP,The Wireline Pumping tee connection thread is used to connect the wellhead manifold to provide a path for large flow. NPT thread hole on the other side of the tee body is a pressure release valve . After installing the pressure
release valve, it can be used for pressure relief to ensure safe operation.

II. General Technical Parameters
                                                     OTIS Quick Union

Bore

Work Pressure

Service

Connection

Seal Dia.

2.5"

5K 10K

Std H2S

5"-4ACME

3.5"

3"

5K

H2S

5"-4ACME

3.5"

3"

10K

Std

5"-4ACME

3.5"

3"

10K

Std H2S

5-3/4"-4ACME

4"

2.5"

15K

H2S

5-3/4"-4ACME

4"

4"

5K 10K

Std

6-1/2"-4ACME

4.75"

3"

15K

Std H2S

7-1/2"-4ACME

5.5"

5"

5K

Std H2S

8-1/4"-4ACME

6.188"

                                                        BOWEN Quick Union

Bore

Work Pressure

Service

Connection

Seal Dia.

2.5"

5K 10K

Std H2S

4-3/4"-4ACME

3.75"

3"

5K 10K

Std

4-3/4"-4ACME

3.75"

3"

5K

H2S

4-3/4"-4ACME

3.75"

3"

5K

Std H2S

5-1/2"-4ACME×2

4.375"

3"

10K

Std

5-1/2"-4ACME×2

4.375"

2.5"

15K

Std H2S

6-5/16"-4ACME

4.375"

3"

10K

Std H2S

6-5/16"-4ACME

4.375"

Ⅲ. Pressure Testing:
1. Install the pressure test connector and connect the pressure test line;
2. Start the pressure test pump to carry out the pressure test. Refer to the specific specifications and drawings for the test pressure and time. Fill in the test record card.

Ⅳ. Daily Maintenance
1.After use, the O-ring and seal should be replaced;
2.When not in use, should take the protector and brush the thread with anti-rust oil for storage.
Welcome to contact us at any time.

Hot Products

Nickel Alloy 15k Quick Test Sub Wireline Pressure Control Equipment 5K Wireline Quick Test Sub ...
5K 10k Wireline Tool Trap Manual Wireline Pressure Control Wireline Manual Tool Trap is a safety ...
5K Wireline In Situ Test Sub Wireline Pressure Control Equipment Ⅰ. Introduction During Wireline ...
Alloy Steel Slickline Wireline Chemical Injection Sub Liquid Chamber Ⅰ. Introduction Chemical ...
5K 10K Wireline Tee joint Wireline Pressure Control Equipment H2S Standard 5K 10K Wireline Tee joint ...
Wireline Wellhead Adapter Slickline Pressure Control Equipment I. Introduction The Wellhead Adapter ...