Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

Borehole Blasting 400m Depth water well drilling equipment Customized Diameter

Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village, Yingli Town, Jinzhou City, Hebei Province, China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Borehole Blasting 400m Depth water well drilling equipment Customized Diameter

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

Borehole Blasting 400 Meters Depth Water Well Drilling Machine with Customized Diameter​

 

 

ST400 Water Well Drilling Rig Description

 

The well drilling rig machine can work on different formations, well drilling diameter up to 305mm,drilling depth 400m.lightweight, efficient, versatile drilling hole equipment, which is mainly applied in drilling wells, irrigation wells, geothermal wells and air holes for other purposes, especially for mountain and rock formation water engineering. 

The pneumatic drilling rig is multifunction, with different configurations suitable for different geologies.Accept customization,any good ideas please contact us, our engineers will help you get what you want, we can also put the platform on a truck mounted chassis

 

ST400 Water Well Drilling Rig Parameters

 
Product Type
Pneumatic Drilling Rig
Model
ST400
Drilling Diameter
105-300mm
Drilling Depth
400m
One-time Advance Length of the Drill
3000/6000mm
Walking Speed
6km/h
Climbing Ability
25
Min. Ground Clearance
300mm
Working Air Pressure
1.7-3.5Mpa
Air Consumption
17-35m3/min
Main Power
100KW/6Cylinder
Rotation
45-75rpm
Rotary Torque
9000-10000N.m
Dimension

6m×2m×2.5m

Total Weight
10T

 

ST400 Water Well Drilling Rig Features:

 

1.The series of drill rig adopts a excavator crawler chassis and has strong off-road performance.

2. independent module design allows the drill to be mounted on the truck to increase its mobility. Two speeds of rotating and advancing speed can meet the different needs of soil and rock drilling. Combined positioner, the positioning disc can be adjusted and replaced according to different types of drill pipe and impactor, so as to ensure the accuracy and reliability of the positioning and centering.

3.The hoisting mechanism is convenient for hoisting of drill pipe and impactor, so as to reduce the labor intensity.
4.This machine can be applied to various strata, used in water well engineering, geothermal well, anchor pile hole and so on, and can be used with follow-pipe drilling. It has the advantages of whole machine hydraulic control, automatic loading and unloading drill pipe, crawler type chassis, large horsepower diesel engine, four hydraulic support leg balance, stronger terrain application ability and so on.

 

Structure and working principle


1. Chassis rubber wheel chassis. Drag to walk.
2. The frame of frame welding structure is welded on the chassis. 
3. The carriage with welded structure adopts hot-rolled carbon channel steel and square steel pipe as the guide rail of the swivel head,
The oil cylinder is controlled to rise and fall smoothly through the one-way throttle valve. 
4. The slewing mechanism is composed of hydraulic motor and slewing reducer. Two high-performance low-speed high torque hydraulic horses
To drive the rotary reducer, you can obtain different torque and speed.

 

How can we do a good job in the maintenance of well drilling rig? Today, I'll talk about the five steps of well drilling rig

 

1. Pay attention to check whether the bolts and nuts of water and gas pipelines and various accessories of the drilling rig are firm at any time

2. . Always check the lubricating oil condition of the wind motor

3. . When the working face is immersed in water, a large-diameter drill head shall be used to insert the drill pipe when opening the hole, so that the drill pipe is 1-2 meters above the water surface to prevent mud and rock slag from falling into the hole

4. . The drilling rig is not allowed to reverse during drilling operation, so as to prevent the drill pipe from falling into the hole

5.. When the drilling rig stops working for a short time, a small amount of air pressure shall be given to prevent sediment from invading the interior of the percussion device of the drilling rig. If the drilling rig stops working for a long time, the percussion device shall be lifted 1-2m away from the hole bottom for fixation

 

 
 
 
 
 
 

 

Hot Products

Large Horsepower Rock Blasting ST 200 Water Well Borehole Drilling Rig ST 200 Water Well Drilling ...
Borehole Blasting 400 Meters Depth Water Well Drilling Machine with Customized Diameter​ ST400 Water ...
180 Meters Water Well Drilling Rig Industrial Deep Borehole Rock Stone Blasting ST 180 Water Well ...
150M Water Well Drilling Machines Durable Fast Speed Portable Exploration Rig XY-1A 150 Water Well ...
DTH Blalsting Borehole Deep Groundwater 350 Meters Water Well Drilling Rig ST 350 Water Well ...
Product Description: Water Well Drilling Rig: GK 200 Are you looking for a reliable and efficient ...