Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

200 Meters High Drilling Speed Deep Underground Water Well Pneumatic Drilling Rig

Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village, Yingli Town, Jinzhou City, Hebei Province, China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

200 Meters High Drilling Speed Deep Underground Water Well Pneumatic Drilling Rig

Country/Region china
City & Province jinzhou hebei
Categories Bag Making Machinery Parts
InquireNow

Product Details

200 Meters High Drilling Speed Deep Underground Water Well Pneumatic Drilling Rig

 

 

ST 200 Pneumatic Drilling Rig Introduction

 

ST 200 drilling rig is with 200 meters drilling depth , used to drilling wells,irrigation wells,ground source heating pump wells and boreholes for other purposes,especially for mountain and rock formation well projects.The rig can be drill in different layers.

 

ST 200 Pneumatic Drilling Rig Technicals

 

ModelShitan ST 200
ConditionNew
Drilling Depth 200 Meters
PowerDiesel
OriginChina
Brand NameShitan
UsageWater Well Drilling
Dimension(L*W*H)6400MM*2250MM*2700MM
Weight5800KG
Certification
ISO9000
Warranty1 YEARS
Marketing TypeLarge Pneumatic 
Hole Diameter90-200mm
Depth25M
Rotary speed0-90rpm
DTHK40
Drilling Rods76*2m+76*3m
Air consumption13-20m3/min
Travelling speed0-2.5km/h


ST 200 Pneumatic Drilling Rig Features

 

This is a lightweight, efficient, versatile drilling hole equipment, which borehole drilling machine is mainly applied in drilling wells, irrigation wells, geothermal wells and air holes for other purposes, especially for mountain and rock formation water engineering. The water well drilling rig machine can work on different formations, well drilling diameter up to 245mm. The drill machine adopts new hydraulic technology, supporting high torque hydraulic motor rotation and big bore drill hydraulic propulsion, branded multi-cylinder engine-powered two-stage air filter and the intake air compressor designed for hydraulic systems, extend the life of diesel engines. Unique pump design to facilitate maintenance, reduce maintenance costs. Centralized hydraulic control console, easy to operate.

 

Canot do water well drilling in rainy days?

 

After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large drawdown pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain superelevation, and the frozen soil in the backfill in winter shall not exceed 15%.

 

 Water Well Drilling Work Attentions

 

1. The drilling unit must first drill holes, take samples and draw the drilling profile structure diagram (histogram).

2. According to the histogram: geological structure, the upper pipe and filter pipe of the well shall be made, and the drilling diameter shall not be less than 300mm.

3. After the well is drilled and the pipe is laid, the backfilling amount of filler shall be 1.8-2.0 m3, and it must be ensured that the outside of the well pipe wall is more than 70 mm. The filter material is siliceous sandy pebble without impurities. It is better to mix according to the pebble particle size (20-40mm). During filling, materials shall be fed layer by layer manually. It is strictly prohibited to backfill filter materials mechanically and soil into the well. Gravel filling method: generally, circulating water or still water is used for gravel filling. If the filling quantity and height of filter material are greatly different from the plan, find out the reasons, deal with them properly, and record the filling results.

4. After well completion, the well pipe shall be vertical and not inclined.

5. The polyethylene plastic pipe wall of the well pipe is 8mm thick. The well pipe adopts a drilling filter. The drilling hole is 18-20mm, and the drilling rate is not less than 25%. The well pipe shall be overlapped and the filter screen shall be fixed. Screw joint is adopted for well pipe lapping and drilling φ 8mm hole, mounting φ 10mm screw. The mesh of the filter screen is about 25 mesh, and the filter screen is wrapped in 2 layers.

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 

Hot Products

Crawler Drilling Rig For Water Well Drilling Rig Machine Driven By Diesel Engine Introduction of 200 ...
St 260 Meters Large Horse Power Yuchai Diesel Engine Customized Borehole Water Well Drilling Rig ...
Gy200 Investigation Prospecting 300 Meters Water Well Borehole Drilling Rig GY200 Water Well ...
Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 ST 200 Water Well Drilling ...
Large Horsepower Rock Blasting ST 200 Water Well Borehole Drilling Rig ST 200 Water Well Drilling ...
Borehole Blasting 400 Meters Depth Water Well Drilling Machine with Customized Diameter​ ST400 Water ...