Jinzhou City Shitan Machinery Equipment CO. LTD. |
Verified Suppliers
|
|
ST 450 Water Borehole Pneumatic Drilling Rig For Rocky Blasting
ST 450 Pneumatic Drilling Machine Introduction
ST 450 drilling rig is mainly used to drilling wells,irrigation wells,ground source heating pump wells and boreholes for other purposes,especially for mountain and rock formation well projects,the drilling depth is 450 meters ,hole-diameter is 105-350 mm ,lift power is 24MT.
ST 450 Pneumatic Drilling Machine Techs
Drilling depth | 450m |
Dia.hole | φ105-305mm |
Advance Length one time | 6.6m |
Working pressure | 1.7-3.3MPa |
Air consumption | 17-35m³/min |
Length of rod | 1.5m,2m,3m, (6m can be choosed) |
Dia. Of rod | φ89,φ102,φ114 |
Lifting power | 24T |
Rotation torque | 6200-8500 N.m |
Rotation Speed | 55-115r/min |
Diesel Engine | Yuchai |
Engine Power | 85Kw/2200rpm |
Travelling speed | 0-2.5 Km/h |
Climb capacity | 30° |
Weight | 9000kgs |
Dimension | 5500x1900x2780mm |
Application | Complicated geological conditions: Rock, Mud, Sand etc. |
Drilling Way | Top drive hydraulic rotary and propulsion, Dth Drilling or Mud Pump
Driling |
DTH Hammer | 4",5",6",8",10" Drill hammer or CIR110, 130, 150,170 |
ST 450 Pneumatic Drilling Machine Features
1.High drilling efficiency, power provided by 92KW Yuchai diesel
engine
2.High efficiency(20M~40M/Hour), large rotary torque(8500N.m)
3.Integrated automation equipment,All terrain moves by itself
4.Adopt consummate design, long service life
5.Self loading and unloading,easy to operating.
Shitan Machinery Service
1. It has different models used for water well drill rig,mine blast
hole drill,underground drill project,,etc
2.T/T 30% as deposit, and 70% before delivery. We'll show you the
photos of the products and packages before you pay the balance.
3.Generally, it will take 7 -10 working days after receiving your
advance payment.
The specific delivery time depends on the items and the quantity of
your order.
4.Our main machine enjoys a 1 year warranty(except for the hammer),
during this time all accessories
broken can be changed for a new one.And we provide videos for
machine install and operation.
Drilling Rig Working Attention
1. Before each shift, grease the drill pipe elevator (wire rope
connector);
Note: When filling grease nipple at one end of the elevator, be
sure to unscrew the grease nipple at the other end. This will help
to squeeze out the butter that was previously injected. On the
contrary, the oil seal in the elevator may be crushed, and dirty
water containing fine sand and mud can easily enter, which will
wear the bearing and reduce the sensitivity of the elevator.
Note: For the improved new elevator, please consult SANY User
Service Department for maintenance method.
2. Before each shift, grease the bearing of the follow-up guide
frame (upper support of drill pipe) of the drill pipe;
3. Frequently check whether the wire rope is in good condition;
4. Frequently check the damage of oil pipes and sealing rings, and
prepare spare parts for urgent needs;
5. Pay attention to whether the circuit relay is aging at any time,
and prepare spare parts as soon as possible;
6. Check whether the bearing of drill pipe elevator (wire rope
connector) rotates flexibly, and replace it immediately if it is
damaged;
7. Frequently check whether the bolts and pin shafts are worn or
broken, and replace them immediately if they are damaged.
Product Showcase
Accessories
Drilling Working Site