Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

St 260 Meters Pneumatic Drilling Rig Industrial Underground Water Borehole

Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village, Yingli Town, Jinzhou City, Hebei Province, China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

St 260 Meters Pneumatic Drilling Rig Industrial Underground Water Borehole

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

ST 260 Meters Industrial Underground Water Borehole Pneumatic Drilling Rig

 

 

ST 260 Pneumatic Drilling Rig Description

 

 The water well drilling rig machine can work on different formations, well drilling diameter up to 245mm. This is mainly applied in drilling wells, irrigation wells, geothermal wells and air holes for other purposes, especially for mountain and rock formation water engineering.Drilling Depth is 260 meters and use Yuchai diesel engine.

 

ST 260 Pneumatic Drilling Rig Tech Details

 

Hole Diameterφ105-260mm
Drilling Depth260 meters
Working pressure1.7-3.0MPa
Air consumption17-35m³/min
Length of rod1.5m,2m,3m,6m
Dia. Of rodφ76, φ89,φ102,φ114
Lifting power24T
Rotation torque8500-11000N.m
Rotation Speed40-70r/min
Diesel EngineYuchai
Engine Power85Kw/2200rpm
Travelling speed0-2.5 Km/h
Climb capacity30°
Weight9000kgs
Dimension5900x2000x2850mm
ApplicationComplicated geological conditions:Rock,Mud,Sand etc.
Drilling WayTop drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling
Dth Hammer4",5",6",8" Drill hammer or CIR110, 130, 150,170

 

ST 260 Pneumatic Drilling Rig Features

 

1. Equipped with 75KW Yiqi brand turbocharged engine, strong power;
2. Patented design composite boom, double cylinder lift, long stroke, large tonnage
3. The main boom of each rig is equipped with a stopper to protect the cylinder;
4.Drilling machine chassis: professional excavator chassis ,durable,heavy bearing capacity,wide chain plate, less damage to hard road.
5.Parallel gearbox design, separate oil pump, sufficient power supply, reasonable distribution, unique design of hydraulic system,simple maintenance and low cost
6. The travel motor is equipped with reducer, durable and long service life;
7.Dust-reducing device: effectively reduce dust pollution, for potholes, tunnel construction.
8.Fast distribution valve: the speed of three gears up to 150-160 rpm, basically achieve the dual-use function of water and air
9.Each hydraulic hose is covered with soft management set to make the hose last longer.
10.The rig power is driven by the diesel engine, and the rig's walking, turning, propulsion, lifting, outriggers, and unloading
rods are all controlled by hydraulic pressure.

 

ST 260 Pneumatic Drilling Rig Application
 
The water welll drilling rigs are available in various models and sizes. These rigs are offered in various technical specifications as per the client’s specific need.is mainly applicable to industrial and civil drilling, geothermal drilling, has the advantages of compact structure, fast advancing, mobile and flexible wide application region etc.. Pneumatic well drill is especially suitable for water intake in

 

Precautions for drilling machine working at low temperature

 

1. In the low temperature environment, the land will become hard, so when we choose the site, we need to have some requirements. The site needs to be flat and the road needs to be unblocked. This must be ensured.

2. The drilling machine mainly uses triangular support, especially in the case of low temperature, we should ensure that the support of the drilling machine is firm and reliable. Our staff need to regularly check and deal with hidden dangers in time once they are found. We must not be careless

3. Although we work at low temperature, we can not ignore the problem of fire prevention. The configuration of fire-fighting equipment must be reasonable and meet the fire-fighting requirements.

4. Low temperature, low temperature, what is the most important? Of course, our friends should pay attention to their warmth when working. Only when they are warm can we better put ourselves into work.

5. The temperature is low, which will definitely have certain impact on the construction. We must pay attention to warmth and safety

 

Hot Products

St 260 Meters Large Horse Power Yuchai Diesel Engine Customized Borehole Water Well Drilling Rig ...
Gy200 Investigation Prospecting 300 Meters Water Well Borehole Drilling Rig GY200 Water Well ...
Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 ST 200 Water Well Drilling ...
Large Horsepower Rock Blasting ST 200 Water Well Borehole Drilling Rig ST 200 Water Well Drilling ...
Borehole Blasting 400 Meters Depth Water Well Drilling Machine with Customized Diameter​ ST400 Water ...
180 Meters Water Well Drilling Rig Industrial Deep Borehole Rock Stone Blasting ST 180 Water Well ...