Home Companies ZHANGJIAGANG FLAME MACHINERY CO.,LTD.

0.2-2m/Min VFD H Beam Welding Line For Assembly / Electron

ZHANGJIAGANG FLAME MACHINERY CO.,LTD.
Active Member

Contact Us

[China] country

Address: Gangcheng Avenue, Zhangjiagang City,Hebei Province,China

Contact name:Info

Inquir Now

ZHANGJIAGANG FLAME MACHINERY CO.,LTD.

0.2-2m/Min VFD H Beam Welding Line For Assembly / Electron

Country/Region china
City & Province hebei
InquireNow

Product Details

Integral H Beam Welding Line for Assembly , Electron Beam Welder

 

 

Quick Details

 

  • “Beam Welding Line” automatic, two heads submerged arc-welding lines for T / I girder beam.
  • 2sets of American Lincon DC-1000, NA-3S SAW welding system to ensure good welding quality;
  • Japan Mitsubishi PLC controller;
  • Hydraulic type post deformation device to straighten the beam;
  • The beam is fed into the machine and both sides of the beam are welded simultaneously.
  • Save space and economize workshop; shorten the production time and improve the efficiency;
  • Economize the investment of crane equipment and operator;

 

 

2. Main Parameters

 

ModelZHJ18
Suitable web height mm200—1800
Suitable web thickness mm6—32
Suitable flange width mm200—800
Suitable flange thickness mm6—40
Straightening thickness mm6—35
Fillet height mm≦8
Work-piece length mm4000—15000
Feeding speed m/min0.2—2 (VFD)
Input conveyor m3conveyorss, each 2.6m (one powered)
Output conveyor m11.5m, including lift conveyor
Machine power kW18.1
Power supplyAC380V, 50HZ, 3P or tailor made
Above are our standard models and parameters, and it can be designed and manufactured on request.

*We reserve the right to alter specifications without prior notice.

 

 

3. Introduction

 

H-beam combination workstation is used for H-beam or T-beam assembly, welding and straightening. It centralize the assembly, welding and straightening functions on one machine which saves space and economize workshop.Reduce workflows: shorten the production time and improve the efficiency. Economize the investment of crane equipment and operator.

 

  • These machines are specifically designed for the manufacture of welded “T” and double “T” girder-beams with parallel or converging flange.
  • They enable the welding to be carried out on items with the web located vertically and without any need for tacking.
  • Tacking will only be required at the top in order to obtain the proper angle between the web and the flange.
  • When double “T” beams are being manufactured, once the first flange has been welded, the beam is flipped over and fed back into the unit once again.
  • This machine is capable of welding both symmetrical and non-symmetrical beams without the need for tacking;
  • A flange post-deformation device mounted at the machine exit enables the machine to compensate for any flange deformation resulting from the welding process.
  • This device is easily adjustable to handle various flange dimensions and a variety of different deformable thicknesses up to a maximum of 40 mm at maximum width.
  • The welding line can be equipped with a control PLC from Mitsubishi.

 

 

4. Reference Photos

 

 

 

 

Hot Products

Gantry U Beam and Box Beam Assembling Machine Motorized Travel Quick Details Used for the assembly ...
Industry Beam Electroslag Welding Process with Column Boom Structure Quick Details Electro-slag ...
Cantilever SAW H Beam Welding Line Automatic With 380V 50HZ Quick Details Both Gantry type or ...
Box Beam Welding Line , Electron Beam Welder Column Boom Frame Quick Details Electro-slag welding to ...
Integral H Beam Welding Line for Assembly , Electron Beam Welder Quick Details “Beam Welding Line” ...
Industrial Hydraulic Beam Welding Line Flange Straightening Machine Features 1. The straightening ...