Guang Zhou Sunland New Energy Technology Co., Ltd. |
Verified Suppliers
|
|
TAC-BMS-16S100A-20A16s For 18650 Battery Pack,-20-75℃ Storage Humidity
1. Functional Features
High-integrated analog front-end
Adjustable
overcurrent protection
Isolation of the power supply circuit
Has a variety of dormancy
and awakening modes
Integrated serial port IC
Low power consumption
High Voltage Accuracy (≤10mV)
RS485
Communication
High Current Accuracy (≤2%@FS)
Adjustable Parameter
Settings
4-Way Battery Temperature Detection (≤2°C)
Data
Refresh Interval (Period) ≤ 2 Seconds
SOC Estimation Function
LED Status Indication Function
SOH Estimation Function
Charge Equalization Function
Short Circuit Protection Function
SOC Accuracy
(≤5% @ 50% Capacity Range Or More)
2. Functional Block Diagram
3. Environmental Requirements
Projects | Parameters | Unit |
Operating Temperature | -20 to 75 | ℃ |
Storage Temperature | -40to 75 | ℃ |
Operating Humidity | 95(45℃±2℃) | %RH |
Storage Humidity | 95(45℃±2℃) | %RH |
Temperature Measurement | -40 to 125 | ℃ |
Atmospheric Pressure | 70~106 | kPa |
4. Electromagnetic compatibility
4.1 Electrostatic discharge of disturbance immunity:
Meet the requirements of GB / T 17626.2-2018 grade 4, contact 8KV
and air 15KV; work normally after test.
4.2 Transmission of harassment limits:
Meeting the conduction harassment limit shall meet the requirements
of Table 8 (quoted from Article 5.1 in GB 9254-2008); it shall work
normally after the test.
4.3 Radiation harassment limits:
Meeting the radiation disturbance limits shall meet the
requirements of Table 9 (quoted from Article 6.1 in GB 9254-2008);
working normally after the test.
4.4 Surge (shock) disturbance resistance:
The communication port and the power supply port shall adopt the
corresponding isolation measures, and the communication port line
alignment shall meet the GB / T 17626.5-2019 grade 2 (open circuit
test voltage for 0.5kV), the line to ground shall meet the
requirements of GB / T 17626.5-2019 grade 2 (open circuit test
voltage: 1kV); the power port line shall meet GB / T.
The requirements of 17626.5-2019 grade 4 (open circuit test voltage 2kV), and the line alignment shall meet the requirements of GB / T 17626.5-2019 grade 4 (open circuit test voltage 4kV).
5. Install connection instructions:
There are strict sequence requirements on the protection board.
First weld B-, P-, B +, P +, and plug in the battery sampling line
connector in order from low to high. After power on, charge or
button activation. Load or charger can be added after all cables
are installed.
When removing, first unplug the charger or load, remove the battery
sampling line connector in the order from high to low, and finally
remove B +, P +, B-and P-.
6. Display size diagram
7. Precautions for use:
1) When connecting the battery lead, note not to misconnect or
reverse connect. If the wrong lead is connected, it may cause
damage to this circuit board, which should be re-tested again
before use.
2) When assembly, the protective plate is careful not to directly
contact the surface of the cell to avoid damage to the cell. Ensure
the assembly.
3) In the process of use, pay attention to the lead head, soldering
iron, solder and other components do not touch the components on
the circuit board, otherwise it may lead to damage to the
protection board.
4) The use process should pay attention to anti-static,
moisture-proof, waterproof and other measures.
5) Please follow the designed parameters and the conditions of
use during the use process, and do not exceed the relevant values
in this specification, otherwise it may lead to damage to the
protection plate.
6) After combining the battery pack and the protection panel,
if there is no voltage output or no charge for the first time,
please re-check whether the wiring is correct.