Home Companies Guang Zhou Sunland New Energy Technology Co., Ltd.

TAC-BMS-16S100A-20A16s Battery Electronic Component For 18650 Battery Pack -20-75℃ Storage Humidity

Guang Zhou Sunland New Energy Technology Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No.27 BOWANG Street ,Nan Cun Town, Panyu, Guangzhou, GD,China

Phone: 86-020-28991965

Contact name:Alice

Inquir Now

Guang Zhou Sunland New Energy Technology Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

TAC-BMS-16S100A-20A16s Battery Electronic Component For 18650 Battery Pack -20-75℃ Storage Humidity

Country/Region china
City & Province guangzhou
Categories Other Consumer Electronics
InquireNow

Product Details

TAC-BMS-16S100A-20A16s For 18650 Battery Pack,-20-75℃ Storage Humidity

 

1. Functional Features
 
High-integrated analog front-end                                                            Adjustable overcurrent protection
Isolation of the power supply circuit                                                        Has a variety of dormancy and awakening modes
Integrated serial port IC                                                                           Low power consumption
High Voltage Accuracy (≤10mV)                                                             RS485 Communication
High Current Accuracy (≤2%@FS)                                                         Adjustable Parameter Settings
4-Way Battery Temperature Detection (≤2°C)                                         Data Refresh Interval (Period) ≤ 2 Seconds
SOC Estimation Function                                                                        LED Status Indication Function
SOH Estimation Function                                                                        Charge Equalization Function
Short Circuit Protection Function                                                             SOC Accuracy (≤5% @ 50% Capacity Range Or More)
 
 
2. Functional Block Diagram

 
 
3. Environmental Requirements
 

ProjectsParametersUnit
Operating Temperature-20 to 75
Storage Temperature-40to 75
Operating Humidity

95(45℃±2℃)

%RH
Storage Humidity

95(45℃±2℃)

%RH
Temperature Measurement-40 to 125
Atmospheric Pressure70~106kPa

 

4. Electromagnetic compatibility

 

4.1 Electrostatic discharge of disturbance immunity:


Meet the requirements of GB / T 17626.2-2018 grade 4, contact 8KV and air 15KV; work normally after test.


4.2 Transmission of harassment limits:


Meeting the conduction harassment limit shall meet the requirements of Table 8 (quoted from Article 5.1 in GB 9254-2008); it shall work normally after the test.


4.3 Radiation harassment limits:


Meeting the radiation disturbance limits shall meet the requirements of Table 9 (quoted from Article 6.1 in GB 9254-2008); working normally after the test.


4.4 Surge (shock) disturbance resistance:


The communication port and the power supply port shall adopt the corresponding isolation measures, and the communication port line alignment shall meet the GB / T 17626.5-2019 grade 2 (open circuit test voltage for 0.5kV), the line to ground shall meet the requirements of GB / T 17626.5-2019 grade 2 (open circuit test voltage: 1kV); the power port line shall meet GB / T.

The requirements of 17626.5-2019 grade 4 (open circuit test voltage 2kV), and the line alignment shall meet the requirements of GB / T 17626.5-2019 grade 4 (open circuit test voltage 4kV).


5. Install connection instructions:

There are strict sequence requirements on the protection board. First weld B-, P-, B +, P +, and plug in the battery sampling line connector in order from low to high. After power on, charge or button activation. Load or charger can be added after all cables are installed.
When removing, first unplug the charger or load, remove the battery sampling line connector in the order from high to low, and finally remove B +, P +, B-and P-.

 

6. Display size diagram


 
 
7. Precautions for use:


1) When connecting the battery lead, note not to misconnect or reverse connect. If the wrong lead is connected, it may cause damage to this circuit board, which should be re-tested again before use.
2) When assembly, the protective plate is careful not to directly contact the surface of the cell to avoid damage to the cell. Ensure the assembly.
3) In the process of use, pay attention to the lead head, soldering iron, solder and other components do not touch the components on the circuit board, otherwise it may lead to damage to the protection board.
4) The use process should pay attention to anti-static, moisture-proof, waterproof and other measures.
5) Please follow the designed parameters and the conditions of use during the use process, and do not exceed the relevant values in this specification, otherwise it may lead to damage to the protection plate.
6) After combining the battery pack and the protection panel, if there is no voltage output or no charge for the first time, please re-check whether the wiring is correct.

Hot Products

16S65A-2000W Battery Management System Protection Plate ,1.5V Alkaline Battery 1. Functional ...
16S150A Li-Ion Lithium Battery of BMS Protection Board For monitoring equipment 1. Functional ...
TCA BMS-16S200A-20A Alkaline Battery Pack Battery Management System 1. Functional Features High...
TAC BMS-16S100A-20A Alkaline Battery BMS Board,PCB Protection For Electric Vehicle 1. Functional ...
TAC-BMS-16S100A-20A16s For 18650 Battery Pack,-20-75℃ Storage Humidity 1. Functional Features High...
LiSOCl2 battery ER14505S 3.6V 1.8AH high temperature battery Quick detail of Lifepo4 Battery Cycle ...