Home Companies CHINA HARZONE INDUSTRY CORP.,LTD.

Aisi Mechanized Bridge Fast Curb Weight Of Erection Vehicle 33t

CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Us

[China] country

Trade Verify

Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province

Contact name:Sun Ruyu

Inquir Now

CHINA HARZONE INDUSTRY CORP.,LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Aisi Mechanized Bridge Fast Curb Weight Of Erection Vehicle 33t

Country/Region china
City & Province wuhan hubei
InquireNow

Product Details

Curb Weight Of Erection Vehicle 33t Mechanized Bridge Fast Bridge

 

Description of Curb Weight Of Erection Vehicle 33t Mechanized Bridge Fast Bridge:                                                              
                                      

Curb Weight Of Erection Vehicle 33t Mechanized Bridge Fast Bridge is a set of mechanized bridge with long single span accepted by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.

 

The whole set of  Curb Weight Of Erection Vehicle 33t Mechanized Bridge Fast Bridge is composed of three parts: bridge span, erection vehicle and transportation vehicle.

 

 Main features of Curb Weight Of Erection Vehicle 33t Mechanized Bridge Fast Bridge:

1 Fast erection: 90min (To erect a 51m bridge)

2 Excellent cross country performance: Cross country chassis (8×8 erection vehicle, 6×6 transportation vehicle) 

3 Less operators: 3-4(not including drivers)

4 Large single span: max. single span reaches 51m

5 High mechanization level, low labor intensity: using remote control operation

6 Less composition unit: one erection vehicle, six transportation vehicle

 

Technical parameters of Curb Weight Of Erection Vehicle 33t Mechanized Bridge Fast Bridge​:

 

NoItemData
1Curb weight of erection vehicle33t
2Curb weight of transportation vehicle21t
3Dimension of erection vehicle (L×W×H )13.6m×3.2m×3.47m
4Dimension of transportation vehicle (L×W×H )12m×3.4m×3.5m
5Load capacity 
 Tracked load60T
Wheeled load13T
6Life time10000 times
7Erection length17m,25.5m,34m,42.5m,51m
8Erection width4m
9Negotiating depth:±3m
10Erection maximum longitudinal gradient10%
11Erection maximum transverse gradient5%
12Erection time (complete bridge)90min
13Retrieval time (complete bridge)90min
14Operator(not including driver)3~4
15Ambient temperature-41℃~+50℃

 

Curb Weight Of Erection Vehicle 33t Mechanized Bridge Fast Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.

Our Service

1,For all your inquires about us or our products,we will reply you in details within 24 hours.

 

2,We own professional sales&after-sales services who can speak fluent English language.

 

3,Tail-made Welcome to submit your idea, we can turn your idea to products.

 

4,Discounts are offered based on order quantities.

 

Hot Products

Small Span From 40m To 80m Steel Truss Bridge Compact Panel Bridge Small Span From 40m To 80m Steel ...
Designed Span 6-60m Deck Type Steel Deck/ Wood Deck Steel Truss Bridge Designed Span 6-60m Deck Type ...
54m Emergency Bridge Steel Truss Bridge Description of 54m Emergency Bridge Steel Truss Bridge 54m ...
Designed Load HL-93 Compact Panel Bridge Steel Truss Bridge Description of Designed Load HL-93 ...
Length 81m Design Load HS20-44 Steel Girder Bridges Description of Length 81m Design Load HS20-44 ...
1m Passenger Foot-Bridge Permanent Steel Girder Bridge Description of 1m Passenger Foot-Bridge ...