CHINA HARZONE INDUSTRY CORP.,LTD. |
Verified Suppliers
|
|
Length 81m Design Load HS20-44 Steel Girder Bridges
Description of Length 81m Design Load HS20-44 Steel Girder Bridges :
Length 81m Design Load HS20-44 Steel Girder Bridges are deck bridges which are used for short and medium spans, for
highway bridges composite deck construction is generally used
unless the depth is very critical in which case half-through
girders or through trusses may be necessary.
Length 81m Design Load HS20-44 Steel Girder Bridges surface protection can be paint or hot-dip galvanized.
Length 81m Design Load HS20-44 Steel Girder Bridges load capacity, width can be designed according to user's requirements
Introduction of Length 81m Design Load HS20-44 Steel Girder Bridges :
Length 81m Design Load HS20-44 Steel Girder Bridges is a standard bridge equipment, adopted extensively and the most
popular in the world
Advantage of Length 81m Design Load HS20-44 Steel Girder Bridges :
Possessing the features of humble structure,
suitable transport, rapid erection
easy-going disassembling,
weighty loading capacity,
huge stability and lengthy fatigue life
being capable of an alternative span, loading capacity
Features of Length 81m Design Load HS20-44 Steel Girder Bridges:
1. Great strength and enormous stiffness , relative to the concrete
bridge can be reduced trabecular high and self-confidence
2. Due to the steel isotropic, quality of a material is uniform and
modulus of elasticity, that make steel bridge in the working
condition and calculation compared with the assumption
3. Steel bridge usually USES factory, site splicing, the
construction period is small, processing convenient and not
affected by seasonal effect.
4. Steel bridge is fit for industrialized manufacture and very
suitable to transport.
5. Steel bridge is informal to repair and replace, long generation,
material can be recycled.
Application of Length 81m Design Load HS20-44 Steel Girder Bridges:
Beam bridge,arch bridge,rigid frame bridge,cable-stayed
bridge,suspension bridge. passenger foot-bridge
Mixture form to erect all kinds of Length 81m Design Load HS20-44 Steel Girder Bridges:
Impermanent Bridges, Spare Bridges and Secure Bridges.
Using the bridge equipment, the interruption bridges of mixed span
can be erected.
The bridge has the advantages of few components, light weight and
little cost.
Bailey Bridge requires no unusual tools or heavy equipment for
construction, the bridge elementsare small enough to be carried in
, and the bridge is strong enough to carry . It is considered a
huge example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is alike
to the compact 100 panelbridge from their appearance. The variance
is its increased panel height to 2.134m. It employed the method of
alternating joints between Reinforcement Chords and the joints
between panels. This method can decrease inelastic deformation
caused by the oversized pinholes.
Pre-arch method is used to moreover cut down mid-span and vertical
deflection to a larger degree.
Bolt-connected components use the orienting sleeve- fixing method
to increase accuracy of connections. Shear is created in orienting
sleeves and tension is developed in bolts, which increase the usage
life of the bolts and ensure the safety of panel bridges. Wind
resistant brace is made to be composite type and is connected to
transom/girders to improve overall stability of panel bridges.
Competitive Advantage of Length 81m Design Load HS20-44 Steel Girder Bridges:
Heavy loading capacity
Used as permanent bridge
Good stability
Simple in structure
Long service life
Rapid in erection
No headroom limit
No width limit