Home Companies CHINA HARZONE INDUSTRY CORP.,LTD.

Erection Length 17-51m Mechanized Bridge Emergency Steel

CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Us

[China] country

Trade Verify

Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province

Contact name:Sun Ruyu

Inquir Now

CHINA HARZONE INDUSTRY CORP.,LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Erection Length 17-51m Mechanized Bridge Emergency Steel

Country/Region china
City & Province wuhan hubei
InquireNow

Product Details

Erection Length 17-51m Emergency Bridge Mechanized Bridge

 

Description of Erection Length 17-51m Emergency Bridge Mechanized Bridge:                                                              
                                      

Erection Length 17-51m Emergency Bridge Mechanized Bridge is a set of mechanized bridge with big single span accepted by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.

 

Erection Length 17-51m Emergency Bridge Mechanized Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.

 

Specification of Erection Length 17-51m Emergency Bridge Mechanized Bridge

Curb weight of erection vehicle (including 3 men)                                      32.5t

Curb weight of transport vehicle                                                     20.8t         

Bridge bay weight:                                                                  9.2t

Design load: tracked load                                                        LD-60

             Wheeled (load on axle)                                               LT-20

Erection length                                            17m, 25.5m, 34 m, 42.5 m, 51 m

Erection width                                                                      4m

Erection time (complete bridge)                                                    75min                                            

Retrieval time (complete bridge)                                                   75min

Operator                                6~7 men (not including drivers of transport vehicles)

 

Erection Length 17-51m Emergency Bridge Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.

Our Service

1,For all your inquires about us or our products,we will reply you in details within 24 hours.

 

2,We own professional sales&after-sales services who can speak fluent English language.

 

3,Tail-made Welcome to submit your idea, we can turn your idea to products.

 

4,Discounts are offered based on order quantities.

Hot Products

Small Span From 40m To 80m Steel Truss Bridge Compact Panel Bridge Small Span From 40m To 80m Steel ...
Designed Span 6-60m Deck Type Steel Deck/ Wood Deck Steel Truss Bridge Designed Span 6-60m Deck Type ...
54m Emergency Bridge Steel Truss Bridge Description of 54m Emergency Bridge Steel Truss Bridge 54m ...
Designed Load HL-93 Compact Panel Bridge Steel Truss Bridge Description of Designed Load HL-93 ...
Length 81m Design Load HS20-44 Steel Girder Bridges Description of Length 81m Design Load HS20-44 ...
1m Passenger Foot-Bridge Permanent Steel Girder Bridge Description of 1m Passenger Foot-Bridge ...