Shandong Shangqing Environmental Protection Technology |
Verified Suppliers
|
|
Low Power Stainless Steel Integrated Sewage Treatment Plant 100m³/D
Integrated Sewage Treatment Plant is a state-of-the-art wastewater treatment system designed to process both aerobic and anaerobic sewage with an advanced automated control system. It has the capability to handle flow rates ranging from 10m³/D to 200m³/D and can be scaled up to 30m³/D, 150m³/D and 20m³/D. The system is equipped with a Programmable Logic Controller (PLC) that enables it to operate efficiently and automatically. It is highly reliable and can be used in a variety of applications for treating wastewater and recovering resources. The Integrated Sewage Treatment Plant is an ideal solution for sewage treatment and resource recovery, providing a robust, efficient and cost-effective solution.
Name | Integrated Sewage Treatment Plant |
---|---|
Efficiency | High |
Operation | Automatic |
Control | PLC |
Process | Aerobic/Anaerobic |
Maintenance | Easy |
Design | Advanced |
Capacity | 30m³/D, 100m³/D, 100m³/D |
Material | Stainless Steel |
Application | Industrial |
The Integrated Sewage Treatment Plant, with its brand name Shangqing Environmental Protection and model number SQYWS, is a highly efficient and low power treatment plant from Shandong China, with product qualification certificate. The minimum order quantity is 1 unit, and the delivery time is usually 15-30 working days. It is perfect for industrial applications, with customized capacities of 20m³/D, 100m³/D, 80m³/D, 200m³/D, and 500m³/D. The plant is controlled by PLC, with high efficiency and low power consumption.
Shangqing Environmental Protection presents a range of Integrated Sewage Treatment Plants that meet your specific requirements for capacity ranging from 20m³/D to 80m³/D, and up to 150m³/D. Our high performance systems are designed with advanced technology, and can be either aerobic or anaerobic. We are certified with Product Qualification Certificate, and the minimum order quantity is 1 unit. We guarantee a 15-30 working days delivery time, and a 1 year warranty with easy maintenance.
Integrated Sewage Treatment Plant will be packaged in accordance with the applicable regulations and standards for transportation. We will use special crates and containers to ensure the safety and integrity of the product during transportation.