Home Companies Lockey Safety Products Co.,Ltd

OEM Plastic Shackle Keyed Alike Safety Lockout Padlock With Master Key

Lockey Safety Products Co.,Ltd
Active Member

Contact Us

[China] country

Address: Building D, Tangxian Industrial Zone, North Baixiang Town, Yueqing, Zhejiang, China.

Contact name:

Inquir Now

Lockey Safety Products Co.,Ltd

OEM Plastic Shackle Keyed Alike Safety Lockout Padlock With Master Key

Country/Region china
City & Province zhejiang
Categories X-Ray Equipment
InquireNow

Product Details

38mm OEM Cheap Plastic Shackle Keyed alike Safety Lockout Padlock With Master Key

Part No.: WCP38P

Safety padlock

a) Made of copper cylinder and key.More resistantant to corrosion and rust.Very stable,with more then 1 million times operating.

b) Reinforced nylon body, withstand temperature from -20℃ to +80℃. The steel shackle is chrome plated; the non-conductive shackle is made from nylon, withstand temperature from -20℃ to +120℃, ensuring the strength and deformation fracture not easily.

c) Key Retaining Feature: When the shackle is open, the key can’t be removed.

d) Laser printing and logo engraving available if required.

e) All different colors available.

Part No.Shackle MaterialA(mm)B(mm)C(mm)Specification
WCP25S

 

Steel

414525

Support keyed alike, keyed differ, master keyed and grand master keyed system.

 

WCP38S414538
WCP76S414576
WCP25P

 

Nylon

414525
WCP38P414538
WCP76P414576

Instruction on operation of equipment maintenance blackout in coal washing plant

1. Scope of application of this instruction: daily maintenance, regular maintenance, overhaul, emergency repair and emergency rescue of equipment in coal washing plant.

2. Equipment maintenance must implement the power failure listing system (no telephone contact allowed). When the maintenance personnel enter the machine, there must be a special person to monitor the machine, and the power failure device should be locked, and the key should be taken by the staff who enter the machine.

3. Equipment installation and maintenance personnel shall strictly observe the safety operation rules of each type of work; The workshop shall confirm the person responsible for equipment maintenance, and the electrician shall stop power transmission. The person responsible for maintenance shall fill in the "contact list of power cut off and transmission", and the electrician shall issue and collect the power cut off license. Power distribution room, distribution point power supply and distribution maintenance inspection, switching operation, reverse cut, etc., but also need to deal with the first or second kind of operation ticket.

4. Power failure listing process:

4.1 the maintenance person shall go to the power distribution room to get and fill in the power failure card, and fill in the contact list for power outage.

4.2 before maintenance, the maintenance responsible person shall send the emergency stop button on the hanging site of the first power failure plate to the dispatching laboratory (signed by the dispatcher on duty), the second power failure plate to the dispatching laboratory (signed by the dispatcher on duty), the third power failure plate and the contact list of power stop and power transmission signed by each unit to the electrician of power stop and power transmission operation. If other units are involved, a fourth blackout sign is required and signed by the duty officer.

4.3 power failure operation: the power failure operator electrician shall store the "contact list of power failure and transmission" in the power distribution room and distribution point on file and record. The power failure operator electrician shall hang the third power failure plate (signed by the maintenance responsible person, the dispatcher on duty, the power failure operator electrician, and the duty director of other units) on the handle of the power failure switch. Then power off and pull out the drawer.

4.4 power transmission operation: the maintenance supervisor shall collect the first and second power failure plates and send them to the power distribution room. The power failure operator electrician shall fill in the power transmission record. Then pick up the third block of blackout, restore power.

4.5 power failure operation union thin, storage of three power failure CARDS.

4.6 end of shutdown operation.

 

Hot Products

Brand Loto Lock Padlocks Keyed Different Safety Pad lock China Red Supplier Part No.: WCP38S Safety ...
38mm OEM Cheap Plastic Shackle Keyed alike Safety Lockout Padlock With Master Key Part No.: WCP38P ...
38mm Short Metal Shackle Abs Lock Body Keyed To Alike Plastic Safety Padlock Part No.: WCP38S Safety ...
Cheap 76mm Long Shackle Lockey Best Quality OEM Safety Padlock Lockout Part No.: P76S 76mm Long ...
Security Safety Lock out Yellow 38mm Custom China Padlocks and Keys in Bulk Part No.: P38P 38mm ...
Security Mini 25mm Aluminum Padlock Safety Outdoor Lockout Locks Keyed Alike Part No.: ALP25 25mm ...