New sandwich systerm running track 13mm easy installation good
resilience
Technical Data
Product Name | Sandwich Running Track |
Material | Top layer EPDM +TPU Rolls+PU |
Color | Customized, Red, Green, Blue |
Thickness: | 13mm or customized |
Application | Runway, Playground, Athletic track for school, university, Stadium,
sport center, etc. |
Model Number | Semi-fabricated system |
Overseas Install | Available |
Free Sample | Available |
Packaging Details | Packed in roll with plastic film. |
Delivery Detail | shipped in ten days after paid |
TPU semi-prefabricated plastic rubber running track surface
TPU semi-precast runway is made of waterproof base coating, bonding
layer, TPU elastic layer, PU strengthening layer and top paint. The
overall selection of high quality polyurethane materials;
Environmental protection and stability, low compression deformation
rate, good rebound performance; Seamless structure, can realize the
site secondary leveling.
Suitable for kindergarten, primary and secondary schools and other
size of the stadium, track and field, large international events,
national greenway, playground road, etc.
Standard for the construction of plastic racetracks
1. The standard runway is 400 meters long and consists of two
parallel straights and two curves of equal radius. Except for grass
runways, the inside of the runways should be made of a suitable
material with a convex border division of about 5cms wide and at
least 5cms wide.
2. The length of the runway should be measured 30cms outside the
convex edge inside the runway. If there is no convex edge, the
length should be measured 20cms outside the outside edge of the
mark line.
3. For all track events of 400m and below, each athlete shall have
a divider with a minimum width of 1.22m and a maximum width of
1.25m. The divider width is 5cm and all dividers shall be the same.
Running Track Advantages
* Environmental-friendly, non-toxin, non-pollution and recyclable.
* All weather use.
* Outdoor and Indoor are available.
* Good performance for aging, electrical insulation,corrosion and
impact-resistant.
* Strong wear resistance, good weather resistance,Strong
compression resistance, good elasticity, good impact absorption,
anti-Strong nail force, flat, good adhesion, durable.
* Convenient to install and easy to maintain.
Prefabricated Athletic Track Instructions:
1. After ensuring that the foundation is flat and the vertical and
horizontal slopes meet the drainage requirements of the stadium,
pre-lay lines for the foundation of the site.
2. Within the runway line planned to be laid on the day, place the
required rolls in length units of each roll.
3. Stir the required base adhesive within one hour on a controlled
site.
4. Use a special cart to transport the stirred adhesive out of the
required site and scrape it evenly.
5. On the basis of laying the coiled material and scraping the
glue, spread it flat and longitudinally according to the line, and
then compact it with a special roller.
6. Prepare polyurethane elastic material on the laid TPU coil, stir
it evenly according to the ratio strictly, and spread the surface
reinforcement layer according to the required thickness.
7. After the reinforcement layer is cured, mix the surface glue and
glue, and use the runway sprayer to spray the surface layer on the
whole site.
8. After the surface layer is completely dry, mark the runway
boundary and clean up the site.
Basic quality requirements
Plastic runway construction is based on asphalt or cement, and the
basic practice is roughly the same as road construction. The
foundation surface requires good flatness, so as to ensure the
consistency of the thickness of the plastic surface layer. The
quality requirements for the plastic runway foundation are as
follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle
5%), longitudinal < 1%, jump area less than 0.4%, the surface
should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters
straightedge measurement error is not more than 3㎜.
(3) Positioning: In order to accurately construct and draw lines,
the four semi-circular tangents and two circular centers of the
runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after
a heavy rain. In frozen areas, it is better to add a buffer layer
of geotextile between asphalt layer and gravel layer. Special
waterproofing should be done along the foundation of the drain
trench.
(5) Strength and stability: the foundation should have a certain
strength and stability, the surface is uniform and solid, smooth
without cracks, no rotten edge pile squeezing, no pockmarked
surface, smooth and smooth joints without obvious height
difference. The cushion is compacted with a density of more than
95%. After being pressed by a medium roller, there are no
significant tire marks and loose float soil.
Why we make choice to buy Sandwich sports surface flooring material
from your factory?
Because our Sandwich sports flooring surfaces offer numerous
advantages:
- High UV weather resistance,non-toxic, easy installation
- Maximum abrasion resistance and permanent elasticity
- High degree of adjustable area elasticity and point elasticity
- Spike resistance even under constant load
- Long life,permanent bond with case