Home Companies Jiangsu Acemien Machinery Co., Ltd.

60kg/H 5um Filament 550KW PPE PP Meltblown Nonwoven Fabric Making Machine

Jiangsu Acemien Machinery Co., Ltd.
Active Member

Contact Us

[China] country

Address: No.2,Changhong Road, Modern Agriculture Demonstration Park, Zhangjiagang City, China

Contact name:Tang

Inquir Now

Jiangsu Acemien Machinery Co., Ltd.

60kg/H 5um Filament 550KW PPE PP Meltblown Nonwoven Fabric Making Machine

Country/Region china
Categories Cap Making Machinery
InquireNow

Product Details

The Forming of Meltblown Fabric
 
A die mold with densely sprinkled nozzles is the most important part among all of the component in a complete meltblown production line.
During the production, the temperature of the mold is maintained at about 300 degrees.
 
Around the nozzle, a highspeed hot air flow blow the molten PP polymer that is being ejected.The hot air flow stretches the molten polymer from
the spineret, and then the enlongated PP plymer meets the atmosphere cold air outside the die mould to condense and solidify to form a short filament with diameter around 3um, which is finally attached to the roller or conveyor belt freely under the action of gas turbulence.
 
The temperature of the hot air blowing near the nozzle is between 230 to 360 degrees, and the compressed air speed is upto 05.-0.8 times of the speed of sound.
 
The diameter of the thin filament is in the micron grade, and is about a few tenth of the thickness of our hair thread.Before attaching to the drum, the fibers will not only be laminated and bonded, but also entangled with each other with sufficient cohesion, which can form a stable structure and a certain strength.
 
Then, the fibers on the drum are rolled,pressed and electreted to produce the final meltblown sheet in roll, or cut in different size by cutting
machine.
 

General Equipment List

No.MachineQuantityRemarks
1Automatic Feeder1 Set1.For granulate material loading
2.Feeder's height from material source is no more than 6m.
2Vaccum Loader1 Set200kg/h 3KW
3Screw Extruder1 SetSJ90 single screw 55KW, heating 35KW
4Screen Changer1 SetHydraulic driven,2 postion screen
5Metering Pump1 Set100CC 3KW
6Connector&Fittings1 SetPipe,flang,fiberglass cotton
7Combination Meltblow Mould1 SetLOA:1800mm, In use: 1600mm D=0.3mm 24KW
8Air Blower1 Set110KW 50KP 80CBM/Min
9Preheater1 Set240KW
10Centrifuge1 Set132KW 3Kpa 9600CMB/Min
11Air Hose Connection1 SetSUS304
12Forming Net Station1 SetLine speed 0-50m/min, Net is made of Polyamide,4KW
13Electricostatic Device1 Set1600mm
14Automatic Roller and Cutter1 Set0-50m/min , 2 working positions
15Vaccum Burning Oven1 Set 
16Ultrasonic Washing Machine1 Set 

 

The Specification of Die Mould and Spineret
1,Overall length of die mould: 1864mm
2,NO. of holes: 2314
3,Diameter of hole: 0.3mm
4,Hole pitch: 0.7mm
5,Hole depth: 3.5mm
6,Die mould and spineret material: SUS630
7,Style of die mould: Clothes Hanger Style
 
 

Flowchart for meltblown nonwoven fabric production

 
 
 

 

Fabric Products Specification
1,Fabric size: 2-5um
2,Production Capacity: Max 60kg/hr
3,Fabric GSM: 10-80g/sm
4,Fabric Width: 1600mm
5,Line Speed: 0-50m/min
6,Fabric Application: Industry use, mask making, PPE making.

 
 
After-Sales Service
1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. ACEMIEN will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 12 months since date of bill of lading
During this guarantee period, ACEMIEN will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, ACEMIEN will provide the buyer spare parts at cost price.
c. Long-term service:
ACEMIEN will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.

Hot Products

PVC ASA Roof Tile Production Line Flowchart Production Line Principle This roofing tile production ...
Plastic Roof Tile Production Line Flowchart PVC Plastic Roof Tile Production Line Introductioin This ...
Plastic Glazed Roof Tile Production Engineering Drawing PVC Plastic Roof Tile Production Line ...
Production Line Principle The final product of this prodcution line to make to nonwoven fabric as S...
The Forming of Meltblown Fabric A die mold with densely sprinkled nozzles is the most important part ...
Plastic Glazed Roof Tile Production Engineering Drawing PVC Plastic Roof Tile Production Line ...