![]() Active Member
|
[China]
Address: No.2,Changhong Road, Modern Agriculture Demonstration Park, Zhangjiagang City, China
Contact name:Tang
Jiangsu Acemien Machinery Co., Ltd. |
|
The Forming of Meltblown Fabric
Generally the principle of this line is similar to most of
common plastic sheet extrusion line which is widely used in many
fields of our lif, so let's focus on more about the forming of
metlblown fabric.
A die mold with densely sprinkled nozzles is the most important
part among all of the component in a complete meltblown production
line.
During the production, the temperature of the mold is maintained at
about 300 degrees.
Around the nozzle, a highspeed hot air flow blow the molten PP
polymer that is being ejected.The hot air flow stretches the molten
polymer from
the spineret, and then the enlongated PP plymer meets the
atmosphere cold air outside the die mould to condense and solidify
to form a short filament with diameter around 3um, which is finally
attached to the roller or conveyor belt freely under the action of
gas turbulence.
The temperature of the hot air blowing near the nozzle is between
230 to 360 degrees, and the compressed air speed is upto 05.-0.8
times of the speed of sound.
The diameter of the thin filament is in the micron grade, and is
about a few tenth of the thickness of our hair thread.Before
attaching to the drum, the fibers will not only be laminated and
bonded, but also entangled with each other with sufficient
cohesion, which can form a stable structure and a certain strength.
Then, the fibers on the drum are rolled,pressed and electreted to
produce the final meltblown sheet in roll, or cut in different size
by cutting machine.
The Wide Range Application of Meltblown Fabric
Quick Machine List for 1600mm Nonwoven PP Meltblown Production
No. | Machine | Quantity | Remarks |
1 | Automatic Feeder | 1 Set | 1.For granulate material feeding,such as masterbatch or pp. 2.Feeder's height from material source should be less than 6m. |
2 | Automatic Vaccum Loader | 1 Set | For loading of raw material 200kg/h 3KW |
3 | Screw Extruder | 1 Set | SJ105 single screw 75KW, heating 35KW |
4 | Screen Changer | 1 Set | Hydraulic driven,2 working postions |
5 | Metering Pump | 1 Set | 120CC 3KW |
6 | Connector&Fittings | 1 Set | Pipe for air, flang, fiberglass cotton for warmkeeping |
7 | Combination Meltblown Mould | 1 Set | LOA:1800mm, In use: 1600mm D=0.3mm 24KW |
8 | Air Blower | 1 Set | 110KW 50KP 80CBM/Min |
9 | Preheater | 1 Set | 240KW |
10 | Suction blower | 1 Set | 132KW 3Kpa 9600CMB/Min |
11 | Air Hose Connection | 1 Set | SUS304 |
12 | Forming Web Station | 1 Set | Line speed 0-50m/min, Net is made of Polyamide with 4KW motor for web rolling |
13 | Electricostatic Device | 1 Set | 1600mm for charging electricostatic |
14 | Automatic Roller and Cutter | 1 Set | 0-50m/min , 2 working positions |
15 | Vaccum Burning Oven | 1 Set | For cleaning of spineret, 10 hours |
16 | Ultrasonic Washing Machine | 1 Set | For cleaning of spineret, 4 hours |
Fabric Products Specification
1,Fabric size: 2-5um
2,Production Capacity: Max 60kg/hr
3,Fabric GSM: 10-80g/sm
4,Fabric Width: 1600mm
5,Line Speed: 0-50m/min
6,Fabric Application: Industry filtration, mask making, PPE making.
After-Sales Policy
1 Technical documents
All the symbols on the equipments should be in English. Seller is
responsible to provide general layout plan, electric plan,
installation direction, and manual book in English to Buyer on
time.
2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is
responsible for all preparation work, e.g. electricity supply,
water supply, labors and cranes, etc.
b. ACEMIEN will prepare for visa application for their engineers,
who are responsible for guide of machine installation and testing
at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if
visa application is approved. The buyer is also responsible to bear
expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's
factory.
e. If buyer doesn't request installation and commissioning by
Seller's engineer in 4 months since date of bill of lading, which
to be accounted all the machines has been successfully tested by
buyer.
3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during
transportation:
In case of quality/quantity discrepancy to destination port in
transportation, customer should file claim within 30 days after the
arrival of the goods at port of destination. Insurance company and
shipping company will be responsible for any discrepancy of the
goods caused by shipping company and other transportation
organization and/or post office.
b. Guarantee period and after-sales services: 12 months since date of bill of lading
During this guarantee period, ACEMIEN will provide spare parts
without any charge in case of quality discrepancy caused by us. If
the malfunctions are caused by your incorrect operations, ACEMIEN
will provide the buyer spare parts at cost price.
c. Long-term service:
ACEMIEN will charge the buyer cost price of spare parts beyond one
year and provide long-term technical guide.