Jiangsu Acemien Machinery Co., Ltd. |
Application and features of the turbo PVC plastic miller
The PVC miller is used mainly for the recycle of heat sensitive plastic into powder, such as waste of PVC pipes,profiles and sheet during production,
and it also has advantages below:
1,Energy saving and high efficiency.
2,Equipped with dust device, have no dust pollution.
3,Discharging valve to set free labor force.
4,Host machine can be opened to carry out repair and replacement for sparepart.
5,Both air cooling and recycling water cooling applied for preventing the milled powder from overheat to cause change of chemical nature of PVC powder.
6,Adjustable Mesh 20-100 for powder control.
Technical data of miller machine
Model | Mian Motor Power(KW) | Blower Power(KW) | Sieve Motor(KW) | Production Capacity(kgs/hr) | Dimension(mm*mm*mm) | Weight(Kgs) |
ACM500 | 37-45 | 3 | 0.55 | 100-300 | 3500*1300*3700 | 1600 |
ACM600 | 45-55 | 5.5 | 0.75 | 200-500 | 3700*1450*3700 | 1800 |
ACM700 | 55-75 | 7.5 | 0.75 | 250-600 | 4100*1600*3800 | 2000 |
ACM800 | 75-90 | 7.5 | 0.75 | 300-700 | 4300*1700*4000 | 3200 |
ACM1000 | 90-110 | 11 | 1.1 | 400-900 | 5000*2000*4300 | 3600 |
After sales service and policy
1 Technical documents
All the symbols on the equipments should be in English. Seller is
responsible to provide general layout plan, electric plan,
installation direction, and manual book in English to Buyer on
time.
2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is
responsible for all preparation work, e.g. electricity supply,
water supply, labors and cranes, etc.
b. ACEMIEN will prepare for visa application for their engineers,
who are responsible for guide of machine installation and testing
at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if
visa application is approved. The buyer is also responsible to bear
expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's
factory.
e. If buyer doesn't request installation and commissioning by
Seller's engineer in 4 months since date of bill of lading, which
to be accounted all the machines has been successfully tested by
buyer.
3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during
transportation:
In case of quality/quantity discrepancy to destination port in
transportation, customer should file claim within 30 days after the
arrival of the goods at port of destination. Insurance company and
shipping company will be responsible for any discrepancy of the
goods caused by shipping company and other transportation
organization and/or post office.
b. Guarantee period and after-sales services: 12 months since date of bill of lading
During this guarantee period, ACEMIEN will provide spare parts
without any charge in case of quality discrepancy caused by us. If
the malfunctions are caused by your incorrect operations, ACEMIEN
will provide the buyer spare parts at cost price.
c. Long-term service:
ACEMIEN will charge the buyer cost price of spare parts beyond one
year and provide long-term technical guide.