Home Companies Beijing Jincheng Mining Technology Co., Ltd.

Portable Slope Anchor Engineering Drilling Rig 80m Drilling Depth High Efficiency

Beijing Jincheng Mining Technology Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Room 1407,BuildingA,No.13,Beiyuan Road,Chaoyang District,Beijing,China

Contact name:Sekura Yu

Inquir Now

Beijing Jincheng Mining Technology Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Portable Slope Anchor Engineering Drilling Rig 80m Drilling Depth High Efficiency

Country/Region china
City & Province beijing beijing
Categories General Industrial Equipment Design Services
InquireNow

Product Details

Portable Slope Engineering Anchor Drilling Rig with 80m Drilling depth 200mm diameter Capacity AK80E

Diesel engine&electric motor drive available

 

Application                                                                                                                                                         

AK-80 construction Anchor Drilling rig is a full hydraulic operated top drive power head drilling machine.

The engineering drilling rig is used to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, as well as drainage holes. It also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. In addition, it is also used for drilling small size water wells and high-pressure jet grouting holes.The construction drilling rig has been already widely used in various projects such as water power stations in Yunnan, Guangxi, Sichuan and Hubei provinces.  

It has also become the first priority machine for medium-duty anchoring-reinforcing projects in China.

Characteristics                                                                                                                                                 

1. It has great drilling capability, wide range of application , rapid drilling speed and high drilling

efficiency, as well as powerful ability of eliminating accident.
2. Extension mechanism, built-in output spindle of top drive head, can protect drilling tools effectively.

It can increase the hole inclination angle range and drill elevation angle hole, while setting the top drive

head and hole top plate toward the opposite direction.
3. A set of front-mounted adjustable columns on drill frame is used for adjusting height of mast front- end, which makes

it easy to align with hole site.
4. Rig structure is separate group design, it assures good disassembility , rapid and convenient mount

and transport, best working environment and lower labor strength as well as remote control and

operation.
5. Mast can be fixed on staging immediately without drill frame with auxiliary parts (horizontal axle and

buckles), which makes it possible for greatly reduce the machine weight and fastener transport.
6. The imported hydraulic motor, other main assembly preferentially selected home made reputed and

high quality products ensure its stable running performance, reliable product quality and long service life.
It has good interchangeability due to the high grade of standardization and serialization of wearing parts.
7. Full hydraulic drive and operation, stepless shift, simple operation, convenient maintenance and few

wearing parts.
8. It can be used with various drilling methods such as carbide bit drilling, anger drilling, DTH hammer drilling and follow-up casing drilling etc.

Specification                                                                                                                                                     

No.SpecificationData.
1Hole depth80-100m
2Hole diameter200-130 mm
3Drill rod89/114×1500 mm
4Hole angle range0-120°
5Rotation Speed5-180 r/min
6Torque3500NM
7Feeding stroke1800mm
8Mast slide stroke500mm
9Lifting force45 kN
10Max.Feed Foce30 kN
11Hydraulic pressure18 Mpa
12MotorY200L-4
13Power30Kw
14Size3400×1000×1500 mm
15Weight1700 kg
16Weight of the heaviest Part200 kg

Packing& Delivery                                                                                                                                            

        

Service                                                                                                                                                                

In our after sales service system, We establish perfect control system strictly according to ISO-9000 series, in this system, technology date and problem solve solution and preventive measures will be provided in any maintain project, all the spare parts will be used in new OEM products with installation instructions, packing list, manufacturer's instruction, qualification and Warranty certificate

 

Hot Products

8X4 heavy duty truck mounted top head water well drilling rig by mud drilling and air compressor ...
Truck mounted 210m Hole Depth Hydraulic Borehole Drilling Machine Water well drilling rig JCDRILL ...
JCDRILL Water Well Drill Rig 400m Truck mounted hydraulic water well drilling equipment Application ...
Water Well Drilling Rig 400m Deep Trailer Mounted Drilling Machine Application Drilling water wells ...
Water Well Drilling Rig Mounted on 4x2 Truck Hard Rock DTH Drilling Application CSD200 4x2 Multi...
400m 4x2 Truck Water Well Drilling Rig Mud And DTH Hydraulic High Rotary Torque Application CSD400 ...