Hebei Kaixiang Electrical Technology Co., Ltd |
|
Anti Corrosion Materials With Professional Produce 200kw AC Load
Bank
Product Description
This system, which is of independent research and development of
electricity load test equipment by our technology, combining dry
load module with the automatic measurement and control module, can
accurately detect all kinds of generator output power and load
capacity, full load and overload test.
Technical Parameters
Rating Voltage/Frequency | 380VAC/50Hz, 3 phase 4 wire |
Rated Load Power | Resistive load: 200kW |
Installed Capacity | Resistive load: 200kW |
Load Step | 1,2,2,5,10,10,20,50,100kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 400VAC/50Hz, 3 phase 4 wire, 230V 1-phase |
Wire Connection | Load power supply input——Copper bar (star coupling) |
Insulation | F |
Duty Cycle | Continuous |
Casing Dimensions and Cooling | about 700*500*300mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air |
Weight | About 300kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
1.Flexible Control Mode: based on different using habit, several
control mode as following can be choosed, local panel operation,
remote box controlling, and intelligent software.
2.Intelligent Load: after setting generator rated power in
software, system realize rapid loading through preset proportion,
automatically and continuously load multiple power value and common
tests, like stepping, full load, and over load, so that improve
working efficiency.
Application
1.Manufacturers of small gas engines also use load banks to test
newly manufactured engines under various mechanical loads.
2.This is accomplished by connecting the engine to the load bank via
a device called a dynamometer.
3.engine performance is monitored and, if necessary, adjustments
are made to ensure the product performs within intended
specifications