Home Companies Hebei Kaixiang Electrical Technology Co., Ltd

Durable Adjustable Load Bank 1200kw For Generator Ups Transformer Testing

Hebei Kaixiang Electrical Technology Co., Ltd
Active Member

Contact Us

[China] country

Address: No33 Wangshan Road, Green Island Economic Development Zone, Shijiazhuang, China

Contact name:

Inquir Now

Hebei Kaixiang Electrical Technology Co., Ltd

Durable Adjustable Load Bank 1200kw For Generator Ups Transformer Testing

Country/Region china
City & Province shijiazhuang hebei
InquireNow

Product Details

westerbeke 1200kw load bank for generator ups transformer testing
Introduction

AC415-1200kW Adjustable Load Bank can accurately test output power and load capacity with all kinds of generators, generator sets for all main electrical parameters including the dynamic parameters tested.

Application

1. factory testing of engine generator sets
2. To reducewet stacking problems

3. Periodic excercising of stand-by engine generator sets

4. Ups system testing
5. Load optimization in prime power applications
6. Factory testing of turbines

 

Technical specification

Technical Parameters
Rating Voltage/FrequencyAC 415V/50Hz, 3 phase 4 wire
Power Factor1
Load Tolerance(each step)±5%
Load Tolerance(overall)±3%
Display Precision0.5 class
Control Power Supplyinput 380VAC 3 phase 4 wire 50hz, phase voltage 220VAC.
Wire Connection

Load Power Supply Input——Copper bar (star connection)

Control power supply input——Connector bar

Communication InterfaceRS232
Insulation ClassF
Working ModeContinuous Working
CoolingForced air cooling,Horizontal inlet air,Horizontal outlet
TransportationHoisting, there are lifting lug in top of case and wheel castors in bottom
Chassis colorgray(RAL7035)
Size

Approximately; 1460*1980*1800

(Width *Length *Height)

WeightApproximately;750kg
Operating Environment Parameter
Ambient Temperature-10℃~+50℃
Relative Humidity≤95%
Altitude≤2500 meters
Atmospheric Pressure86~106kPa
 
Main features

--Real-time parameter: through software to display voltage, current, power, power factor, frequency and time, etc.

--Security monitoring and control: monitor working state of the load bank by watching software light, when abnormally stop and protect, it can show the reason.

--Data collection interval: the minimum data storage interval is two seconds.

--Data save and query: all the test data is saved in the software, easy to query in the history testing data.

--Communication pattern: Intelligent control use photoelectric isolated RS485 interface connect to PC, with great anti-interference performance to make system control stable. Also user can use USB or RS232 through converter.

--Load pattern: Manual Load or Automatic Load.

--Manual Load: Input power, system will load according to preset power.

--Automatic load: user can preset power and length of working time of several load periods, as per 0%→25%→50%→75%→100% or 110% to make testing.

--Parallel testing: when several load bank work in parallel, use can make parallel testing via software, can display, record parameters of every load bank and whole system parameter of parallel operation.

 

 
 
 
 

 
 

 
 

Hot Products

westerbeke 600 KW testing equipment for generator Ups testing Introduction 1. System mainly consists ...
westerbeke 300 KW testing equipment for generator ups transformer testing Introduction AC400-300KW ...
westerbeke 500kw load bank testing for thailand generator UPS Introduction AC400-500kW Automatic ...
westerbeke testing equipment 1000kw Load Bank 3 Phase 4 Wire Introduction This system, which is of ...
westerbeke 1200kw load bank for generator ups transformer testing Introduction AC415-1200kW ...
800 KW westerbeke electrical load bank testing equipment Introduction AC400-800kW Adjustable Load ...