Home Companies TORICH INTERNATIONAL LIMITED

Medium Carbon Steel Seamless Tube Od 6 - 1000mm For Boiler Superheater

TORICH INTERNATIONAL LIMITED

Contact Us

[China] country

Trade Verify

Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China

Contact name:Richard SHEN

Inquir Now

TORICH INTERNATIONAL LIMITED

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Medium Carbon Steel Seamless Tube Od 6 - 1000mm For Boiler Superheater

Country/Region china
City & Province ningbo zhejiang
Categories Metal Casting Machinery
InquireNow

Product Details

ASTM A210 Seamless Medium-Carbon Steel Boiler and Superheater Tubes
 
This specification covers minimum-wall-thickness,seamlessmedium-carbon steel, boiler tubes and boiler flues,including safe ends, arch and stay tubes, andsuperheater tubes.
 
 
Size: Outer Diameter: 6-1000 mm,Wall Thickness: 1- 80 mm,Length :1-12m or as your request
 
Application:Boiler and Superheater
 
Material:10#.20#.16Mn.A106(B,C).ST35-ST52
 
Manufacture
1) Steelmaking Practice The steel shall be killed.
2)The tubes shall be made by the seamless process andshall be either hot-finished or cold-finished, as specified.
 
Heat Treatment:Hot- finished tubes need not be heat treated. Cold-finished tubes shall be given a subcritical anneal, a full anneal,or a normalizing heat treatment after the final cold finishingprocess.
 
Surface Condition:If pickling or shot blasting or both are required, thisshall be specifically stated in the order.
 
Heat Treatment:
1)Cold-drawn tubes shall be heat treated after the finalcold-draw pass at a temperature of 1 200F [640C] or higher toensure ductility satis factory for rolling into tube sheets and tomeet mechanical properties as specified.
 
2)If stress -relief anneal of the U-bends is specified, theanneal shall consist of heating the bent portion within a rangeof 1100 to 1200F [585 to 640C].
 
 
Mechanical Tests Required:
1)Flattening Test One flattening test shall be made onspecimens from each end of two tubes selected from each lot(see Note l) or fraction thereof.
 
2)Flaring Test One flaring test shall be made on speci-mens from each end of two tubes selected from each lot (seeNote l) or fraction thereof. These tubes shall be selected apartfrom those used for the flattening test.
 
3)Hardness I Test Brinell or Rockwell hardness testsshall be made on specimens from two tubes from each lot. Theterm lot applies to all tubes prior to cutting, of the samenominal diameter and wall thickness which are produced fromthe same heat of steel. When final heat treatment is in abatch-type furnace, a lot shall include only those tubes of thesame size and the same heat which are heat treated in the samefurnace charge. When the final heat treatment is in a continuousfurnace, a lot shall include all tubes of the same size and heat,heat treated in the same furnace at the same temperature, timeat heat, and furnace speed.
 
4)Hydrostatic Test .Each tube shall be subjected to thehydrostatic pressure test, or instead of this test, a nondestruc-tive test may be used when specified by the purchaser.
 
 
 

Outside diameter and wall thickness allow deviation                  mm

sort code

Manufacturing
method

Steel tube sizeAllowable deviation

WHR
(WHEX)

Hot rolled(extruded)steel tubeODall±1%Dor±0.50(choose the bigger)
WT≤20

-15% +0.45
-10%S or –0.30
(choose the bigger)

>20±10%S
WHEHeat expand steel tubeODall±1%D
WTall±15%S

WCD
(WCR)

Cold drawn(rolled) steel tubeOD≤30±0.20
30<D≤50±0.30
>50±0.8%D
WT1.5≤S≤3

+12.5%
-10% S

>3±10%S

 

Bending of steel tube per meter

OD/mmBending per meter(mm/m)
≤15≤1.5
>15~30≤2.0
>30 or D≥351≤3.0

 


 
What is your Guarantee?
1.SO9001:2008 and TS16949 certification, SGS, BV, TUV or other third party inspection is available.
2.High quality with competitive price.
3.Advanced technology, experienced engineer, ISO quality system for quality assurance and traceability.
Do you have agent or distributor in our country?
1.We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.
How is your production capability?
1.2000 tons monthly production capacity, 5000 tons monthly trading capability
2.Prompt and Timely shipment
How to get the sample?
1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.
What is your Payment Term?
1.T/T: 30% deposit in advance, the balance 70% paid before shipment
2.30% down payment, the balance 70% paid against L/C at sight
3.Upon negotiation
Who are your customers?
1.Stockists, Distributors,Wholesalors,Agents, Traders, End Users, etc
How long will you react on our requirement?
1.Your requirement would be treated within 24 hours on weekdays. Quotations would be sent upon technical details confirmed by customer!
Any more questions about your doubts, please feel free to send us your emails or call!
ASTM A192 Seamless Carbon Steel Boiler Tubes for High-Pressure Service

































































Hot Products

ASTM A210 Seamless Medium-Carbon Steel Boiler and Superheater Tubes This specification covers ...
ASTM A321 Hot-rolled,quenched,and Tempered Carbon Steel Bars 6.35-241.3mm Out Diameter 1. Scope This ...
Products Description TORICH GB/T3087 Seamless Steel Tube for Low and Medium Pressure Boiler Standard ...
ASTM A519 AISI4130 AISI4140 Seamless Alloy Steel Tubes Size range: O.D.: 6-350mm W.T.:1-50mm L: ...
Products Description TORICH GB/T18248 37Mn 30CrMo Seamless Steel Tube for Gas Cylinder Standard GB...
Products Description TORICH GB/T3093 High Pressure Seamless Steel Tubes for Diesel Engine Standard ...