Home Companies CHENGDU CHUANGRONG TRADING CO.,LTD

90-315mm HDPE Electrofusion Fittings Repair Saddle For Gas Supply PN16 SDR11 PE100

CHENGDU CHUANGRONG TRADING CO.,LTD
Active Member

Contact Us

[China] country

Address: Room13,15/F Building1, Nine Miles Square No.39 Jiancai Road,Chengdu,China.

Contact name:Jenny

Inquir Now

CHENGDU CHUANGRONG TRADING CO.,LTD

90-315mm HDPE Electrofusion Fittings Repair Saddle For Gas Supply PN16 SDR11 PE100

Country/Region china
City & Province chengdu sichuan
InquireNow

Product Details

90-315mm Electrofusion HDPE Fittings Repair Saddle for Gas supply PN16 SDR11 PE100

 

Production Description of Electrofusion HDPE Rrpair Saddle

-Electrofusion HDPE fittings are welded by electrofusion machine to connect HDPE pipes together: After 

electrofusion welding machine plug in electricity and turn on, The copper wire buried inserted in electric

fuse HDPE fittings are heated and make HDPE melt, Which joint HDPE pipe and fittings well.

 

Main reasons to Choose CHUANGRONG Electrofusion HDPE Fittings

1.Technical Support

In order to better serve our customers, we have documented a wide range of Expertise in production and

installation of piping systems to support large and medium-sized projects.

 

2.Thoughtful Service

CHUANGRONG, as China's "GF", we fully understand the needs of customers and provide customers with

the most cost-effective solutions --- one-stop product portfolio of HDPE pipe systems (HDPE pipes, fittings,

welding machines and tools. Also for customers Provide high value-added services, 24 hours to answer

customer questions.

 

Our ultimate goal is to add value to our customers through professional, efficient and cost-effective solutions.

Tailored solutions for customers. Combine our

Expertise in developing and producing pipelines

Systems, and deep industries

And market knowledge, based on long-term

Experience to provide customers with cost-effective solutions.

 

3.Environmental

CHUANGRONG HDPE pipeline system integrates its environmental responsibility into its daily business acti

-vities.

HDPE is a green environmental protection material, which can be recycled without causing pollution to the

environment. We work hard to conserve natural resources and constantly strive to optimize the environmental

performance of our products and how they used.

 

4.​Cost-effective

Highest cost performance

Compared with traditional steel pipes, it is light and easy for workers to install and repair

Low installation and maintenance costs

Easy loading and transportation

Suitable for non-excavation

 

Production workshop & Equippments of Electrofusion HDPE Fittings

Own over 100 sets of injection molding machine;

The largest(300,000g) domestic injection molding machine;

Over 20 units hautomation robot;

8 sets automation Electrofusion HDPE fittings production system.

Annual capacity of over 13000 tons which gives customers huge inventory support.

 

 

 

P2:4.7 Pin(4.0 welded by Switched adaptor)      P3:Printed Parameters       P4:Embedded copper wire
      

1)Fusion Pin of Electrofusion HDPE fittings

4.7mm Pin of Electrofusion HDPE fittings produced.

Besides switched adaptors for 4.0 Pin supplied to suit claw of 4.0 electrofusion machine.

 

2)Moulded-in welding parameters

Welding parameters as per EN1555 is printed on the fittings, Such as Products' name,OD(mm),PE100,

PN16 SDR11.

Bar code is also attached on the electrofusion fittings for scanning.

 

3)Element&Stops

To promote joint quality,all elements are coated with polyethylene before being moulded into the fitting body.

All fittings have removable pipe stops.The stops ensure pipes cannot be inserted past the midpoint,but can

be removed for use in,for example,repair situations.

 

4)High quality copper wire embed in the HDPE fittings which have Good thermal conductivity.

 

Details of Electrofusion HDPE Repair Saddle

Products name

Electrofusion HDPE Repair Saddle

Sizes Available

As below specification sheet in detail

SDR

SDR11

PN

PN16

Material Brand

SINOPEC, BASELL, SABIC, BOROUGE etc

Executive Standard

EN 1555-3:2010

Colors Available

Black color or as request.

Packing Method

Normal export packing. by carton

Production Lead Time

Depending on the order quantity.
Normally about 2~3 weeks for 20' GP, 3~4 Weeks for a 40'GP.

Certificate

ISO, CE,BV,Factory Test Report

Supply Ability

100000 Ton/Year

Payment Method

T/T, L/C at sight

Trading Method

EXW, FOB, CFR, CIF,DDU

 

Specification of Electrofusion HDPE Repair Saddle               

specifications

φD

L

mm

A

mm

H

mm

φd

mm

90145154684.7
110145160604.7
160190230784.7
200190235904.7
250190300654.7
315190300754.7
 

Applications of Electrofusion HDPE Fittings

1.Municipal water supply, gas supply and agriculture etc.
2.Commercial & Residential water supply
3.Industrial liquids transportation
4.Sewage treatment
5. Food and chemical industry
7. Replacement of cement pipes and steel pipes
8. Argillaceous silt, mud transportation
9. Garden green pipe networks

 

 

 

 

 

Inspection Equipment of Electrofusion HDPE fittings

Finished products get well inspection before delivery.

 

Factory Test report of Electrofusion HDPE Repair Saddle

Test itemStandardConditionsResultsUnit
1.Melt Flow IndexISO1133190°C & 5.0Kg 0.2-0.70.49g/10min
2.DensityISO1183@23°C ≥0.950.960g/cm3
3.Oxidation Induction TimeISO11357210°C >2039Min
4. Hydrostatic Pressure TestISO116780°C 165h, 5.4MpaPassed 
5 Size CheckISO312623°CPassed 
6 AppearanceClean& Smooth23°CPassed 
  • The results according to test 1-3 are taken form the PE raw material supplier’s report.
  • The results according to test 4-6 are taken from the internal test results of fittings sampled from the
  • same batch as delivered fittings.
  • Marking according EN 12201 – 3 and EN 1555 – 3.
  • The pass/fail criteria are based on the requirements of the UNI EN 12201 and UNI EN 1555 standards.

Certifications of Electrofusion HDPE Repair Saddle

We can supply ISO9001-2008, BV ,SGS, CE etc certification.
All kinds of products are regularly conducted pressure-tight blasting test,longitudinal shrinkage rate test,

quick stress crack resistance test, tensile test and melt index test, so as to ensure the quality of products

totally reach the relevant standards from raw materials to finished products.

 

Hot Products

PE/steel transition for Gas supply PN16 HDPE Electrofusion Fittings Production Description of PE...
PE/steel transition Threaded for Gas supply PN16 HDPE Electrofusion Fittings Production Description ...
Flange plate OR Backing ring for HDPE Electrofusion Fittings Flange Adapter for Gas and Water supply ...
HDPE Electrofusion Fittings Flange Adapter for Gas and Water supply PN16 SDR11 PE100 Production ...
90-315mm Electrofusion HDPE Fittings Repair Saddle for Gas supply PN16 SDR11 PE100 Production ...
HDPE Electrofusion Standard HDPE Ball Valve for Gas Supply PN16 SDR11 PE100 CE Approved Product ...