Anping County Hengquan Metal Wire Mesh Products Co.,Ltd |
|
PP Biaxial Geogrid 3030 Plastic Civil Engineering Construction
1. PP Biaxial Plastic Geogrid is made from PP resin as its raw material, produced through extruding, punching, heating, longitudinal stretching, transverse stretching.
2. Performance: High tensile strength at both longitudinal & transverse dire.
3. Main type: 15-15, 20-20, 25-25, 30-30, 40-40, 50-50
Feature:
1) High tensile strength at both longitudinal and transverse direction
2) Improving bearing capacity of foundation
3) Preventing cracking and subsiding
4) Convenient to construct, reducing cost and maintaining expense
Tensile strength(MD/CD)
Soft foundation reinforcing for highway, railway, Slop protecting projects, landfill side
Function:
1. Improve the bearing capacity of foundation;
2. Preventing cracking and subsiding;
3. Convenient to construct, reducing cost and maintaining expense
Application
Biaxial geogrid is used to reinforce the weak foundation the
geogrid can quickly improve the bearing capacity of the foundation
and control the development of the settlement. The lateral effect
of the road base can effectively distribute the load to the wider
basement layer, thus reducing the thickness of the base layer and
reducing the engineering Cost, shorten the construction period,
extend the service life.
Biaxial geogrid for reinforced asphalt or cement pavement Geogrid
laying in the bottom of the asphalt or cement pavement, can reduce
the rutting depth, extend the road surface fatigue life, but also
can reduce the thickness of asphalt or cement pavement to save
costs.
For the reinforcement of the embankment dam slope and the retaining
wall the traditional embankment, especially the high embankment
filling often need to fill and the edge of the shoulder is not easy
to compaction, resulting in the late slope of the rain soaking.
Used to strengthen the river seawall can be made of stone cage, and
then with the grid and use, to prevent the dam was washed away by
sea water, stone cage with permeability, can slow down the impact
of the waves to extend the life of the dam, saving manpower and
material resources, shorten the duration.
Used to deal with landfill
Geogrid and other soil synthetic materials used in combination with landfill, can effectively solve the problem of uneven settlement of the foundation, the release of gas emissions and other issues, and can maximize the storage capacity of landfill.
FAQ
1. What is your terms of payment?
A: We accept T/T with 30% deposit, balance against the copy of B/L,
L/C at sight or Alibaba trade assurance for first cooperation.
We'll show you the product photos, packing photos and B/L before
you pay the balance payment by T/T.
2, How can I get sample from you?
A: We provide free sample for testing, but freight cost should be on your account. You could tell us your Fedex/ DHL/ TNT courier account directly, or pay the freight cost by Alibaba trade assurance or western union.
3. What is your terms of delivery?
A: FOB, CIF, CFR, CIP, DDU.
4. How about your delivery time?
A: Generally, it will take 7-10 days after receiving your advance
payment. The specific delivery time depends on the items and the
quantity of your order.
5. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
6: How do you make our business long-term and good relationship?
A: We keep good quality and competitive price to ensure our
customers benefit ; we respect every customer as our friend and we
sincerely do business and make friends with them, no matter where
they come from.