Home Companies Hebei Zexu Pipe Manufacturing Co., Ltd.

Boiler Pipe Purging Steam Blowing Target Plate Mirror Aluminum

Hebei Zexu Pipe Manufacturing Co., Ltd.
Active Member

Contact Us

[China] country

Address: Yanshan County, Cangzhou City, Hebei Province

Contact name:Manager Zhao

Inquir Now

Hebei Zexu Pipe Manufacturing Co., Ltd.

Boiler Pipe Purging Steam Blowing Target Plate Mirror Aluminum

Country/Region china
City & Province cangzhou hebei
Categories Metal Casting Machinery
InquireNow

Product Details

Boiler Pipe Steam Purging Mirror Aluminum Target, Aluminum Target, Aluminum Plate

 

After the piping system is installed, it can be blown by air or steam according to the working conditions of the working medium and the degree of dirt on the inner surface of the pipe. The general requirements for pipe purge are:

 

Equipment and pipes that are not allowed to be purged should be isolated from the purging system.

 

Before the pipeline is purged, orifice plates, flange-connected regulating valves, main valves, throttle valves, safety valves, instruments, etc. should not be installed. For the above-mentioned valves and instruments connected by welding, the bypass should be used or the seal should be removed. Protective measures such as pieces of equipment.

 

The order of purging should be carried out in the order of main pipe, branch pipe, and drain pipe. The blown out dirt must not enter the pipes that have been purged.

 

The dirt discharged by purging shall not pollute the environment, and random discharge is strictly prohibited.

 

A restricted area should be set before purging.

 

After the pipeline has passed the purging, other operations that affect the cleaning shall not be carried out.

 

 

Purging requirements:
1. After the strength test of the piping system, before the air pressure tightness test, purge and clean should be carried out in sections
2. The method of purging should be determined according to the requirements for the use of the pipeline, the working medium and the degree of dirt on the inner surface of the pipeline. The liquid or gas pipeline with a nominal diameter greater than or equal to 600mm should be manually cleaned, and the liquid pipeline with a nominal diameter less than 600mm should be cleaned manually. Use water to clean the gas pipeline with a nominal diameter of less than 600mm, which should be purged with air. Steam pipes should be purged with steam, and non-thermal pipes should not be purged with steam. The purge is generally carried out in sequence according to the main pipe, branch pipe, and drain pipe.
3. Before the pipeline is purged, a detailed purging plan should be prepared and carried out in sections according to the system
4. The equipment and pipes that are not allowed to be purged are separated from the purging system.
5. After the pipeline is qualified for purging, in addition to the required inspection and restoration work, no other work that affects the cleaning of the pipeline shall be carried out, and the "Pipeline System Purging Record" shall be filled in

 

Hot Products

Boiler Pipe Steam Purging Mirror Aluminum Target, Aluminum Target, Aluminum Plate After the piping ...
Steam Purging Target Plate Seat, Target Plate Holder, Target Plate Axis, Target Plate Device When ...
Purge Test 12Cr1MoV Target Plate Device High Pressure Target Plate Shaft Aluminum Target Plate The ...
Vapour Sputtering Mirror Aluminum Target Plate Matching Target Plate Device The target plate is a ...
Aluminum target plate for steam purging of large-aperture pipeline 1200mm*80mm*10 finish mirror ...
New High-Pressure Steam Purging Target Plate Device, Target Plate Axis, Target Plate Holder, Test ...