Home Companies Henan Dongfang Noodle Machine Group Co., Ltd.

Fully Automatic Stick Noodles Production Line Plant ISO9001 CE

Henan Dongfang Noodle Machine Group Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No.18 Dongfang Road, Mazhai Industrial Zone, Erqi District, Zhengzhou, China

Contact name:Annie

Inquir Now

Henan Dongfang Noodle Machine Group Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Fully Automatic Stick Noodles Production Line Plant ISO9001 CE

Country/Region china
City & Province zhengzhou
InquireNow

Product Details

Stick Noodle Machinery Manufacturing Process Fully Automatic Stick Noodle Plant

 

Our company was founded in 1975, which is the largest noodle machine manufacturer in China. It is a company with technology researching, manufacturing and marketing. All the noodle equipment have passed ISO9001 and CE Certification.

 

Main Technical Parameters:

 

Product NameDry Stick Noodles Production Line
Production Capacity36T/24h
Roller Size1000mm
Total Power110KW
Equipment Area90*11*5m
Material304Stainless Steel

 

Electrical Control System:

 

Adopt international first-line brand, safe and reliable;

The whole line realizes automatic control, with sensitive feedback and control

precision;

Through Ethernet communication interface and Internet cloud technology

Retrieve data for remote control and fault analysis.

 

FAQ:

 

What are the raw materials used on the machine?

Our production line mainly uses food-grade SUS304, SUS316, POM and silicone parts that meet hygienic standards, as well as international brand electrical components. We can also make any custom design for you according to your needs.

 

When can I get an engineer from you?

When you have finished preparing the conditions (water, electricity, gas supply, production materials), contact our sales staff. We will send engineers to install your machine and train your staff to use it. Usually, when you are ready, you can contact our sales staff and cooperate with us to process the visa for the engineer, the engineer will arrive within 15 days.

 

How will my machine be installed when it arrives? how much does it cost?

We will send an engineer to your facility to assess the situation, install the machine and train your staff how to operate it. Clients pay for round-trip airfare, accommodation and salary/day/person.

 

Hot Products

Chinese Dried Stick Noodle Production Line Industrial Noodle Making Machine Our company was founded ...
Stick Noodle Machinery Manufacturing Process Fully Automatic Stick Noodle Plant Our company was ...
Stick Noodle Machinery Manufacturing Process Fully Automatic Stick Noodle Plant Our company was ...
Stick Noodle Machinery Manufacturing Process Fully Automatic Stick Noodle Plant​ Our company was ...
Big Scale Stick Noodle Making Process High Efficient Dried Noodle Production Line Our company was ...
Commercial Cup Noodle Production Line Nissin Instant Noodles Machinery Efficient Our company ...