Home Companies Guangzhou GENY Electric Co., Ltd

YC1893D-ICT Meter Testing Bench Closed Links Meter Test System With ICT

Guangzhou GENY Electric Co., Ltd

Contact Us

[China] country

Trade Verify

Address: ROOM 107, 1ST FLOOR, No. 602 GUANGSHAN ER ROAD, TIANHE DISTRICT, GUANGZHOU, CHINA POSTCODE: 510663

Contact name:John Shen

Inquir Now

Guangzhou GENY Electric Co., Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

YC1893D-ICT Meter Testing Bench Closed Links Meter Test System With ICT

Country/Region china
City & Province guangzhou
Categories Level Measuring Instruments
InquireNow

Product Details

Professional Stationary Meter Test Equipment for Closed Links Meters with ICT

Three Phase Closed Links Meter Test System

Technical Data:

  • Accuracy class : 0.05
  • Easy to calibrate I-P closed links meters with isolated current transformer(ICT)

 

Technical spec.YC1893D-ICT-6YC1893D-ICT-12YC1893D-ICT-24YC1893D-ICT-48
Number of meter positions equipped ICT6122448
Accuracy class of ICT0.05 / 0.01
Accuracy0.05
Power SourceYCS-103-250YCS-103-600YCS-103-1200YCS-103-2500
Standard MeterSZ03A-K6 / SZ03A-K8 (customized)
Scanning HeadYCG-S Series
Voltage 
Test voltage output(Phase-Neutral)3x(24V~288V)(or customized)
Power of the voltage outputMax. 3x100VAMax. 3x250VA

Max.

3x500VA

Max.

3x1000VA

ResolutionBetter than 0.01% of full scale value of range
Setting accuracyBetter than 0.05% at the final range value
StabilityBetter than 0.005% /h (integration time 150s)
Load regulation from 0~max. loadBetter than 0.01%
Distortion factorBetter than 0.3% for linear resistance load
Harmonic2nd~21st free programmable
Current 
Test current output3x(1mA~100A)
Power of the current outputMax. 3x150VAMax. 3x350VAMax. 3x750VAMax. 3x1500VA
ResolutionBetter than 0.01% of full scale value of range
Setting accuracyBetter than 0.05% at the final range value
StabilityBetter than 0.005% /h (integration time 150s)
Load regulation from 0~max. loadBetter than 0.01%
Distortion factorBetter than 0.3% for linear resistance load
Harmonic2nd~21st free programmable
Phase angle 
Range0~360⁰
Resolution0.01⁰
Setting accuracy0.1⁰
Frequency 
Range45Hz~65Hz
Resolution0.01Hz
Error display 
Type of error displayRed LED
Resolution of error displays8 digitals
Other 
Voltage supply

3x220/380V±10%(or customized)

50/60Hz ±2Hz

Ambient temperature-10°C~+40°C
Relative humidity35%~85%
 

Description:

1. Install the ICT in each meter position to test three-phase meters with closed current and voltage measuring circuits (I-P links).
2. The meter test system can measure mechanical meters, electronic mechanical meters, and electronic meters through automatic, semi-automatic, or manual operations.
3. Meters being tested: 3P4W, 3P3W, 1P2W.
4. Testing modes: active power, reactive power, cross-connected reactive power.
5. Simultaneously measure meters with the same specifications but different meter constants.
6. Automatically position the rotor mark of the disc of the mechanical meter, with higher efficiency.
7. Starting test and creeping test.
8. With protection functions of overload, short voltage circuit, and open current circuit.
9. The swing of the scanning heads together simplifies the control.
10. Made of aluminum alloy material, light, strong, and corrosion-resistant.
11. The testing software with a friendly Windows 2000/XP/7/8/10 operating system includes functional modules of various modern energy meters required to realize error testing, harmonic testing, demand testing, influence testing, etc.

Applications:

 
1. National utility companies
2. Governmental metrology bureaus
3. Large energy meter manufacturers
 

Primary Competitive Strengths:

 

1. High quality product

2. Over 18 months long warranty

3. High accuracy class: 0.05
*** highest accuracy can reaches to 0.01% under 3 meter positions***

4. 3~48 Three Phase Electric Energy Meter Test bench

5. Extremely high power stability

6. Timing error test

7. Influence test of voltage, frequency, and harmonic

8. Installing RS232, Ethernet communication port in each meter position.

9. Tilt impact test (optional)

 

 

Hot Products

Electronic Meter Test Bench Yc1893D-6 for Three-phase Three-wire Electric Equipment Features& ...
Three-phase Three-wire Electric Equipment Yc1893D-24 Energy Meter Test Bench with Ict Product ...
Three-phase Three-wire Electric Equipment YC1893D Three Phase Meter Test Bench with ICT Product ...
Accuracy of 0.02% Fully Automated Three-Phase Meter Test System The Full Automatic Meter Test System ...
Stationary Meter Test Equipment for Three Phase Electric Energy Meter Calibration Three Phase ...
Professional Stationary Meter Test Equipment for Closed Links Meters with ICT Three Phase Closed ...