Sussman Modular House (Wuxi)Co.,Ltd |
|
Permanent Construction Manufacturer Price Prefabricated Lgs Villa With Fittings
Specification
1. Anti-rust and normally more than 70 years using life.
2. Easy to assemble and disassemble for several times without
damage.
3. Light weight and beautiful.
4. Cost saving and transportation convenient.
Description
Antiseismic: LGS construction uses triangle truss structure of coldformed
steel, its main wall use cold -form steel as frame, bolting makes
the house body tightly connected to the ground, with good ductility
and antiseismic performance. LGS steel construction’s seismic
fortification is up to 9 degree, and steel structure house cause
less damage in the earthquakes than other houses.
Wind Resistance: Cold-formed light weight steel structure buildings
adopt G550 high strength steel with good steel integrity and
flexibility, which can resist 50m/s wind speed. Life and property
will be well protected.
Durable: Light steel structure house is all composed with cold-formed light
steel structure parts which adopt galvanized/aluminum -zinc and
anti-corrosion cold rolling steel plate. This can effectively avoid
being rusted during the constructing and using of steel structure
parts and increase the lifespan to more than 90 years.
Sound insulation: The effect of sound insulation is an important indicator for the
assessment of residential. Light steel system walls formed by light
steel structure, insulation materials and fiber board have perfect
sound insulation and shock absorption technology and meet the
national standards for building sound insulation.
Comfortable: Using energy efficient LGS steel wall system, respiratory
function, it can adjust indoor air humidity. The roof with
ventilation function, which can make the house internally over the
formation of the flow of air, ensure that the roof ventilation and
cooling of the internal demand. The light steel integrated housing
span can up to 6 to 12 m to provide larger living space for
residents, and can also be freely divided. The integrated light
steel building materials are green environmental friendly, and keep
healthy.
Easy-quickly Construction: All materials can be completely produced in factory and installed
at the construction site. It can not only reduce the intensity of
on-site construction, but also improve the efficiency of
construction and engineering quality. The residential environment
can be built before the house and then house can be completely
designed and manufactured in accordance with the demand of the
buyers residential. The interior decoration can be finished one
time through the overall design. Construction is high speed, short
time, high efficiency, less impact from the seasonal. It takes 8
workers to finish 300 square meters villa within 2 months.