Home Companies Wuhan Longgang Pressure Pipeline Co., Ltd.

Q235 Q345 Q195 Precision Seamless Galvanized Steel Pipe 6.4m

Wuhan Longgang Pressure Pipeline Co., Ltd.
Active Member

Contact Us

[China] country

Address: Guangyi Road, Wuxi, Jiangsu Province,China.

Contact name:Christina

Inquir Now

Wuhan Longgang Pressure Pipeline Co., Ltd.

Q235 Q345 Q195 Precision Seamless Galvanized Steel Pipe 6.4m

Country/Region china
City & Province wuxi jiangsu
Categories Metal Casting Machinery
InquireNow

Product Details

 

Q235 Q345 Q195 Q215 Seamless Pipe galvanized steel pipe

 

 

Steel Pipe Type

ASTM 1020 cold rolled precision seamless steel pipe

Outside Dia(mm)

10.3-1219mm

Wall Thickness(mm)

1.5-30mm

Length

Random length:5-12m

Standard

API5L , ASTM A106 Gr.B, ASTM A53 Gr.B, 

ASTMA179/A192/A213/A210/370WP91,WP11,WP22                   GB5310-2009,GB3087-2008,GB6479-2013,GB9948-2013, 

GB/T8163-2008, GB8162-2008,GB/T17396-2009

Material

20#,

A53B, A106B, API 5L

ST37.0,ST35.8,St37.2,St35.4/8,St42,St45,St52,St52.4

STP G38,STP G42,STPT42,STB42,STS42,STPT49,STS49

 

Surface

Black painting, varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE,ect

Certificates

API5L ISO 9001:2008 TUV SGS BV etc

Packaging

Loose package, Packaged in bundles(3Ton Max) , bundled pipes with two slings at the both end for easy loading and discharging, End with Plastic caps or as per requirement

Application

1. Fluid pipe

2. Power Plant 

3. Structure pipe
4. High and low pressure Boiler tube

5. Seamless pipe  /tube for petroleum cracking  

6. Conduit pipe 

7. Scaffolding pipe pharmaceutical andship,building etc.

 

 

 

Production Process


①The main production process of hot-rolled seamless steel pipe (△main inspection process):
Tube blank preparation and inspection△→tube blank heating→piercing→tube rolling→steel reheating→fixed (reduced) diameter→heat treatment△→finished pipe straightening→finishing→inspection△(non-destructive, physical and chemical, Taiwan inspection) → storage
②The main production process of cold-rolled (drawn) seamless steel pipe:
Billet preparation→pickling lubrication→cold rolling (drawing)→heat treatment→straightening→finishing→inspection

 

The production process of general seamless steel pipes can be divided into two types: cold-drawing and hot-rolling. The production process of cold-rolled seamless steel pipes is generally more complicated than that of hot rolling. In the sizing test, if the surface does not respond to cracks, the round tube will be cut by a cutting machine and cut into a billet with a length of about one meter. Then enter the annealing process, annealing should be pickled with acidic liquid, and pay attention to whether there is a lot of blistering on the surface during pickling. If there is a lot of blistering, it means that the quality of the steel pipe does not meet the corresponding standard. In appearance, the cold-rolled seamless steel pipe is shorter than the hot-rolled seamless steel pipe. The wall thickness of the cold-rolled seamless steel pipe is generally smaller than that of the hot-rolled seamless steel pipe, but the surface looks brighter than the thick-walled seamless steel pipe, and the surface is not too much. Much rough, and the caliber doesn't have too many burrs.


The delivery state of hot-rolled seamless steel pipe is generally that the hot-rolled state is delivered after heat treatment. After the quality inspection, the hot-rolled seamless steel pipe must be strictly hand-selected by the staff. After the quality inspection, the surface should be oiled, followed by several cold-drawing experiments, and the perforation experiment should be carried out after the hot-rolling treatment. If the diameter of the perforation is too large, it should be straightened and corrected. After straightening, it is transferred to the flaw detector by the conveyor for flaw detection experiment, and finally labelled and arranged in specifications, and then placed in the warehouse.
 

Round tube billet→heating→piercing→three-roller skew rolling, continuous rolling or extrusion→tube removal→sizing (or diameter reduction)→cooling→straightening→hydrostatic test (or flaw detection)→marking→storage seamless steel pipe It is made of steel ingots or solid tube blanks through perforation to make capillaries, and then hot-rolled, cold-rolled or cold-drawn. The specifications of seamless steel pipes are expressed in millimeters of outer diameter * wall thickness.


The outer diameter of the hot-rolled seamless pipe is generally greater than 32mm, the wall thickness is 2.5-200mm, the outer diameter of the cold-rolled seamless pipe can reach 6mm, the wall thickness can reach 0.25mm, and the thin-walled pipe can reach 5mm. Rolling has higher dimensional accuracy than hot rolling. Generally, seamless steel pipes are made of 10, 20, 30, 35, 45 and other high-quality carbon steel 16Mn, 5MnV and other low-alloy structural steel or 40Cr, 30CrMnSi, 45Mn2, 40MnB and other combined steel hot-rolled or cold-rolled. Seamless pipes made of low carbon steel such as 10 and 20 are mainly used for fluid transportation pipelines. 45, 40Cr and other medium carbon steel seamless pipes are used to manufacture mechanical parts, such as the stressed parts of automobiles and tractors. Generally, seamless steel pipes are used to ensure strength and flattening tests. Hot-rolled steel pipes are delivered in a hot-rolled state or heat-treated state; cold-rolled steel pipes are delivered in a heat-treated state.

 

Hot rolling, as the name implies, has a high temperature of the rolled piece, so the deformation resistance is small, and a large amount of deformation can be achieved. Taking the rolling of steel plates as an example, the thickness of the continuous casting slab is generally about 230mm, and after rough rolling and finishing rolling, the final thickness is 1~20mm. At the same time, due to the small width-to-thickness ratio of the steel plate, the dimensional accuracy requirements are relatively low, and the plate shape problem is not easy to occur, and the main control is to control the crown. For those with organizational requirements, it is generally realized by controlled rolling and controlled cooling, that is, controlling the opening temperature and final rolling temperature of finishing rolling.
Round tube billet → heating → perforation → heading → annealing → pickling → oiling (copper plating) → Multi-pass cold drawing (cold rolling) → billet tube → heat treatment → straightening → hydraulic test (flaw detection) → marking → storage.

 

 

 

Hot Products

316L stainless steel pipe description 316L stainless steel pipe 316L stainless steel seamless pipe ...
904L stainless steel pipe description 904L stainless steel pipe 904L stainless steel seamless pipe ...
C276 stainless steel pipe description C276 stainless steel pipe C276 stainless steel seamless pipe ...
Seamless steel pipe description SA210C seamless steel pipe SA213 T11 seamless steel pipe SA213 T12 ...
Q235 Q345 Q195 Q215 Seamless Pipe galvanized steel pipe Steel Pipe Type ASTM 1020 cold rolled ...
Round 20cr Seamless Tube Precision Seamless Steel Pipe​ Steel Pipe Type ASTM 1020 cold rolled ...