Home Companies JRL International Limited

COB LED Neon Strip with Silicone Co-extrusion 12v/24v 480 LEDs Flexible LED Strip Lights

JRL International Limited

Contact Us

[China] country

Trade Verify

Address: Room 504, Block A, Wanhai Building, No. 1031, Nanhai Avenue, Nanshan District, Shenzhen

Contact name:

Inquir Now

JRL International Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

COB LED Neon Strip with Silicone Co-extrusion 12v/24v 480 LEDs Flexible LED Strip Lights

Country/Region china
City & Province shenzhen
InquireNow

Product Details

COB LED Neon Strip with Silicone Co-extrusion 12v/24v 480 LEDs Flexible LED Strip Lights

 

APO Features:

- More dimensions to choose from, ranging from 8mm. 10mm, 12mm to 14mm

- Slimmer, limitted space installation

- IP65 for indoor and outdoor

 

Specifications:

 

ModelLEDLINE ASTON APO 8
LED TypeLumileds 2835/Sanan 2835
Beam Angle120°
LED PIN TemperatureMax.65℃
Storage Temperature-25℃ ~ +60℃
Life span>54000hrs
CertificationCE, RoHS, Reach, UL
IP GradeIP65
Warranty5 Years
Max. Run Length5M
CRIRa90
LED ColorWhite
VoltageDC24V(23.5Vmin, 24.5Vmax)
Efficiency(LM/W)72.4lm/w
Power10w/m

 

MORE: Message us to customize

 

Download datasheet: LEDLINE ASTON APO.pdf

 

 

Notices:

- Max. run length refers to single side feed in serial connection.
- The given data are typical values due to the tolerances of the production process and the electrical components, values for light output and electrical power can vary up to 10%.
- The given color temperature is the temperature of finished product.


  


FAQ:
 
Commercial CE RoHS Reach UL Certificate Outdoor IP67 Waterproof
 
Q1. Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
 
Q2. What about the lead time?
A: 2-4 weeks after payment.
 
Q3. OEM OR ODM accepted?
A: Yes,we can do OEM & ODM,logo on the light or package both are available.
 
Q4. How do you ship the goods and how long does it take to arrive?
A: Ship by DHL, UPS, FedEx or TNT. It takes 3-5 days to arrive. Airline and sea shipping also optional.
 
Q5.Where is your factory located?
A: Our factory is located in Baoan District,Shenzhen, Guangdong Province, China.
 

Hot Products

COB LED Neon Strip with Silicone Co-extrusion 12v/24v 480 LEDs Flexible LED Strip Lights APO ...
10 mm width IP65 COB LED Neon Strip 12v/24v 280 LEDs High Lumen 100lm/m Specifications: Model ...