Home Companies Hai Lift Machinery Co., Ltd.

300KG 6M Double Mast Aerial Work Platform , Aluminium Industrial Lifting Equipment

Hai Lift Machinery Co., Ltd.
Active Member

Contact Us

[China] country

Address: Xinyang Avenue Extension Section, Jingshan County, Jingmen City, Hubei Province, China

Contact name:Rebecca

Inquir Now

Hai Lift Machinery Co., Ltd.

300KG 6M Double Mast Aerial Work Platform , Aluminium Industrial Lifting Equipment

Country/Region china
City & Province jingmen hubei
Categories Work Platforms
InquireNow

Product Details

Industrial Lifting Equipment 300KG 6M Double Mast Aluminium Aerial Work Platform 

 

Quick detail of aerial work platform:

1. Loading capacity: 300kg

2. Lifting height: 6m

3. Platform size: 1.38*0.6m

 

Specification of aerial work platform:

DescriptionModelMax lifting height (m)Max working height (m)Loading capacity (KG)Platform size (m)Voltage (V)Power (KW)Weight (kg)Size (m)
Double mast aluminum alloy lift platformGTWY-2006S67.73001.38*0.60220/241.54201.45*0.88*1.75
GTWY-2008S89.72501.38*0.60220/241.55601.55*0.88*2.05
GTWY-2009S910.72501.38*0.60220/241.56201.55*0.88*2.05
GTWY-2010S1011.72501.38*0.60220/241.56801.55*0.88*2.05
GTWY-2012S1213.72001.48*0.60220/241.57001.65*0.88*2.05
GTWY-2014S1415.72001.58*0.60220/241.59801.75*0.88*2.30

Tips: It can be customized according to your need about the specifications of the lifting platform.

So please feel free to contact us for any question.

 


 

Feature of aerial work platform:
1.Lift or fall steadily: The seamless transmission is used between the lifting masts, thus minimizing the

amount of sway after lifting.
2.Safe and reliable: The four turning stabilizers of the unit connected to the four corners of the chassis

 support the MEWP duringwork.

They are designed for leveling regulation and preventing inclination. They are composed of stand bars   

and turning legs.

The stand bars are installed in the turning legs.

Extending out the turning legs before operating the unit enlarges the area of supporting. Therefore, the

steadiness of the whole platform is guaranteed.
3.Convenient: The whole work platform is light because the lifting masts are made of alloy aluminum.

The structure is compact and the volume is small, so only one person can move the equipment and carry

it through a very narrow passage.

 

Advantages of aerial work platform:

1.High-strength aluminium structure

2.Overload protection device

3.Emergency lowering device

4.Anti-fall safety devices

5.Strong safety power supply

 

Pictures of aerial work platform:

 

Application of aerial work platform:

This Aerial Working Lift is mainly used for lifting cargos and delivering goods, high-altitude operations.

It is widely used in construction site, building maintenance, factory daily aerial work maintenance and

various kinds of aerial work.

 

About us:

Hai Lift Machinery Co., Ltd. was founded in 1997. Hai Lift is a high tech enterprise of research and

development, manufacture, sales and after-sales service of material handle equipments. With 2 production

bases, covers an area of 20000 square meters, Hai Lift has more than 500 experienced technicians. We can

provide our customers efficient, safe, comprehensive solution for aerial work, cargo lifting, warehousing

& logistics transportation.

 

Hai Lift has always followed a policy of "Quality first, Technology leading, Cooperation and Win-win ”.

Hai Lift has been developing itself by researching on new technology and new products, offering superior

products and service for customers. If you are looking for smooth business, profit and success, we are the

right supplier. With good quality and professional service, we have fully confidence that Hai Lift will be

your best partner. We sincerely hope to cooperate with you for win-win situation.

 

 

FAQ:

Q1: How long is the warranty time ?
A1: 2000 working hours or 12 month, whichever comes first.

 

Q2: How can I get the after-sales service?

A2: Contact with us if you have any question or need professional support. We will try to solve your

problem in 24 hours, and arrange the delivery of spare parts in 48 hours.

 

Q3: What about the delivery time ?

A3: The delivery time is about 10-15days after receipt of down payment.

 

Q4: How to pay for it ?

A4: Generally, we used T/T: 30% as deposit and the balance will be paid before shipment. L/C is

available according to actual conditions.

 

Q5: Can I mix order?

A5: Yes.

 

Hot Products

Small lift table 100kg 9 m single mast aluminum lift platform with CE certification Specification of ...
Hydraulic folding ladders lift table 200kg 12 meter double mast aluminum alloy platform Quick detail ...
Industrial Lifting Equipment 300KG 6M Double Mast Aluminium Aerial Work Platform Quick detail of ...
Aluminum lifter equipment 250kg 8m high rise window cleaning lift platform Quick detail of Window ...
Aluminum lift platform 125kg 6m single mast aerial work platform Specification of aerial work ...
Double Mast Aluminum Lift Table 250KG 10 Meter Mobile Electric Man Lift Quick detail of Electric Man ...