Home Companies Shanghai Yekun Construction Machinery Co., Ltd.

2500rpm Pile Driving Wheel Excavator 6 To 8 Meter Sheet Piles

Shanghai Yekun Construction Machinery Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No.3652, Cao'an Road, Jiading district, Shanghai

Contact name:Shaun

Inquir Now

Shanghai Yekun Construction Machinery Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

2500rpm Pile Driving Wheel Excavator 6 To 8 Meter Sheet Piles

Country/Region china
City & Province shanghai shanghai
InquireNow

Product Details

Wheeler excavator suitable for pile driving work of 6 to 8 meter sheet piles

 

XCMG presenting first ever wheeler excavator which set up with VIBRA FV100 pile driver! You won't find any other wheeler excavator done the pile driving job in the piling construction projects! XCMG ET120 wheeler excavator fitted with FV100 with the goal of performing 6 to 8 meters piling works. The FV100 small pile driver has been well received by customers because of its small structure, light weight and good performance. Majorities of the inner parts of FV100 are European brand high quality parts like, SKF (Sweden) bearing, Brevini (Italy) rotation motor, Hydro Leduc (France) Vibration Motor, Four in one advance control valve (Italy) and Japan NKK control switch. By cooperating with different clamps, it can sink and pull-out steel sheet pile, cement pile, wood pile, steel pipe pile, H-beam steel, steel shield and many more types of piles.

 

Mini hydraulic pile driver for the company's original products, its birth to fill the industry gap; Changed the history of small excavator can not be refitted pile driver; Solve the problem that small foundation pile can not be mechanized construction.

This series of models for the new rural reconstruction of the basic engineering construction has made an outstanding contribution.

 

Features

 

VIBRA hydraulic vibratory hammer is the vibratory driving piling equipment which is popular among a wide variety of foundation projects.Apart from driving and pulling elements such as sheet piles and pipes, vibratory hammers are also used for soil densifying or vertical drainage, especially suitable for municipal, bridges, cofferdam, building foundation, etc.

With advanced technology, vibratory hammer has advantages of low noise, high efficiency, non-pollution and non-damage to piles,etc.

 

Working Principle

 

Hydraulic vibrating pile driver take the advantage of high frequency vibration generated by motor and transit the vibration force to the hydraulic vibrating pile driver for the surrounding soil liquefying & break its structure to reduce the friction; then piling or drilling the pile form the soil ground via excavator. The high frequency vibration is driven by the hydraulic motor of the excavator.

The hydraulic motor drives the two eccentric axes to rotate at high speed in opposite direction. The horizontal force of the eccentric axis cancels each other without vibration. The vertical forces add up to each other, creating a vertical-frequency vibration.

 

Machinery Characteristics

  • The control system adopts integrated import control valve, each action can be controlled independently, convenient for maintenance and check.
  • The vibration frequency is controlled at two stages, and the second stage vibration is the confluence of double pumps, which greatly increases the excitation force and overcomes the special geology.
  • Mini and light weight design make application flexible.
  • Taking the advantage of the excavator hydraulic system without other driving system requirement, which save fuel oil and transportation cost.
  • The operation is simple and easy to learn. The driver who has the operation foundation of excavator can operate it with practice

 

Technical Parameters

 

ItemFV-100FV-150FV-250
Vibration Frequency (rpm)250025002800
Operation Pressure (Mpa)303032
Centrifugal Force (KN)117172265
Max.Pile (m)6810
Arm (kg)160260500
Hammer (kg)85011001700
Excavator (T)6-1212-1720~25

 

 

 

 

FAQ

 

Q: Are you a manufacturer?

 

A: Yes, we have been in this field for more than 12 years, our factory is in Suzhou and you are welcome to visit our unit anytime during working hour period,

 

Q: Who is your main customer?

 

A: Our customers are spreading all over the China with some abroad countries as well namely from New Zealand, Malaysia, Indonesia and many more are joining in the list. Brands like XCMG, SANY, Zoomlion, Caterpillar and Hyundai are our valuable customers.

 

Q: How long is the warranty period ?

 

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

 

Q: What is the MOQ ?

 

A: 1 set is available.

 

Q: What's the payment method ?

 

A: We accept T/T and D/P payment.

 

Q: What is the delivery time ?

 

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

 

Q: Can I have our LOGO on the machine ?

 

A: Of course you can.

 

Q: How is your product quality ?

 

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

 

Q: Can I be your dealer ?

 

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!

Hot Products

Wheeler excavator suitable for pile driving work of 6 to 8 meter sheet piles XCMG presenting first ...
Side grip vibro hammer for narrow construction spaces More secure and quicker than conventional Pile ...
Long sheet pile driving vibro hammer for heavy construction project and hard ground condition In ...
Steel pipe sheet pile driving with excavator mounted vibro hammer In the market today there are two ...
12 meter sheet pile driver for CAT excavator faster construction projects In the market today there ...
RC pile driving with wheeler excavator suitable for 6 to 8 meter sheet piles XCMG presenting first ...