Home Companies Guangzhou Junhui Construction Machinery Co., Ltd.

JCB220 416E 430E Excavator Air Conditioning Accessories Compressor 299 - 2212

Guangzhou Junhui Construction Machinery Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: 101-102, building 3, Kezhu Construction Machinery City, No. 28, Zhuji Road, Tianhe District, Guangzhou

Contact name:LiGuiSong

Inquir Now

Guangzhou Junhui Construction Machinery Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

JCB220 416E 430E Excavator Air Conditioning Accessories Compressor 299 - 2212

Country/Region china
City & Province guangzhou
InquireNow

Product Details

 

JCB220 416E 430E Backhoe Loader Compressor 299 - 2212 Air Conditioning Parts

 

 

Specification

 

Product NameAir Conditioning Compressor
Part Number299 - 2212
ApplicableBackhoe Loader
RefrigerantR134a
OILSP - 20 OR EQUIV
Voltage12V
Reference Weight7KG
PerformanceHigh temperature resistance and long service life
Condition100% New

 

 

Description

 

1. When the air conditioning system is turned on, the accumulator or filter drier should be replaced frequently. Buyer must show proof of receiver/dryer replacement for warranty purposes. In some vehicles, the dryer is attached to the condenser and must be replaced as well
2. The air conditioning system must be clean and free of debris and contamination. In most cases, the components can be flushed; however, in some cases, the condenser or other components may need to be replaced.
3. The orifice tube must be replaced; if the expansion valve is dirty or defective, it must be inspected and replaced.
4. The correct amount and type of oil must be used. Consult the OE manufacturer for this information.
5. A vacuum must be drawn for at least 45 minutes before charging the refrigerant. In humid climates or cool days, this time should be increased to effectively remove air and evaporate moisture.
6. The orifice tube (if equipped) should always be replaced, and the expansion valve (if equipped), if not replaced, should at least be checked for proper operation

 

 

Parts Of The Air Conditioning System

 

1. Compressor: Compress the refrigerant from a low-pressure gas state to a high-pressure gas state.
2. Condenser: Cools the high-pressure gaseous refrigerant from the compressor into a high-pressure liquid.
3. Liquid storage tank: also called desiccant bottle, with desiccant inside, which absorbs the water in the system and stores the refrigerant.
4. Expansion valve: atomize the high-pressure liquid refrigerant into a low-pressure liquid state.
5. Evaporator: also called evaporator, the refrigerant absorbs heat from low-pressure liquid to gaseous state.
6. Blower: Blows the cold air absorbed by the evaporator to the ventilation duct.

Hot Products

DOOSAN DH300-7 2208-6013B Compressor Air Conditioning Parts 24V R134a Specification Product Name Air ...
JCB220 416E 430E Backhoe Loader Compressor 299 - 2212 Air Conditioning Parts Specification Product ...
372-9295 Caterpillar Excavator Compressor E320D2 Air Conditioning Parts Specification Product Name ...
EC360B Excavator Compressor VOE14659238 Air Conditioning Parts Specification Product Name Excavator ...
DH55 DX55 DOOSAN B55W-1 Compressor 2208-6012 Air Conditioning Parts Specification Product Name Air ...
KHR3197 47759181 SD7H13 Compressor SK/SH Air Conditioning Parts Specification Product Name Air ...