Home Companies JINAN HUIYOU CONSTRUCTION MACHINERY CO., LTD

20m-150m Height SC200 Hoisting Equipment with Rack and Mast in Construction

JINAN HUIYOU CONSTRUCTION MACHINERY CO., LTD
Active Member

Contact Us

[China] country

Address: Zhenshan Industrial Park, Zhangqiu, Jinan, Shandong Province, China

Contact name:Mandy Sun

Inquir Now

JINAN HUIYOU CONSTRUCTION MACHINERY CO., LTD

20m-150m Height SC200 Hoisting Equipment with Rack and Mast in Construction

Country/Region china
City & Province jinan shandong
Categories Work Platforms
InquireNow

Product Details

20m-150m Height SC200 Hoisting Equipment with Rack and Mast in Construction

 

 

All kinds of spare parts for 20m-150m Height SC200 Hoisting Equipment with Rack and Mast in Construction
Driving device With 2-motors / 3-motors
Motor 11kw, 14.5kw,18kw
Motor spare parts Braking system; brake sheet, motor adjustor, electromagnet, motor fan
Safety device 30KN, 40KN, 50KN, 60KN
Gearbox 20:1,16:1,14:1,12:1;10:1
Coupling with rubber
Master rollers For 76 tube and 89 tube
Gear rack M8 40x60x1508mm
Gear pinion M8, 15teet
 
 
 
Services for 20m-150m Height SC200 Hoisting Equipment with Rack and Mast in Construction
1. Installation, debugging, operators trainning;
2. Maintanence:
A. when trainning your operators, our engineers will give them advice on how to operate the machines correctly;
B. we will send you the operation manual which can help you operate the machins properly, it can also help you to solve the common problems;
C. Call us at any time if you have problems about our tower crane;
D. If needed, we will send engineers to your site to solve your problems.
3. Providing some documents for your customs clearance, like commercial invoice, packing list, certificate of origin etc;
4. Spare parts supply.
5. More products for you to choose
 
 

 

Specifications for 20m-150m Height SC200 Hoisting Equipment with Rack and Mast in Construction

Rated Load2000kg
Rated Passengers20
Rated Lifting Speed34.4m/min
Motor Power3*11kw
Motor Breaking Torque120N.M
Overrun Protection Device breaking Speed51-56m/min
Overrun Protection Device Rated Breaking Load30KN
Max.Lifting Height150-200m
Cage Size(L*W*H)3.0*1.3*2.3m
Mast Section Size(L*W*H)0.65*0.65*1.508/0.80*1.80*1.508m
Mast Weight158/172kg
Rated Erection Load200kg

 

 
 
FAQ for 20m-150m Height SC200 Hoisting Equipment with Rack and Mast in Construction
Q1: What is the Warranty for construction hoist?
A1: For construction hoist, we can supply 1 year’s warranty. If any quality problem (not artificial reason) on our side occurred during this period, we will supply a free new one as replacement.
Q2: What is the meaning of SC for construction hoist model? And please illustrate.
A2: SC is classified according to China National Standard.
“S” is the acronym of construction hoist in Chinese language (Shi Gong Sheng Jiang Ji);
“C” is the acronym of rack and pinion in Chinese language (Chi Lun Chi Tiao).
 
For example: SC200/200 means rack and pinion type construction hoist. Double cages (“x/x” stands for the cage number, if one cage just show SC200) and 2000kg per cage load (x means the 10-1 of rated lifting load)
Q3: What are the optional parts for your construction hoist?
A3:1) Mast Section with Hot Galvanized;
2) VFD (variable Frequency Drive) for construction hoist, the rated speed could reach 36m/min by using it.
 
Q4: What is the safety device for your construction hoist?
A4: The safety device for construction hoist includes door limiter (up door limiter, single door limiter and double door limiter), up and down limiter, up and down terminal limiter, anti-falling device, and weight limiter with player.
Q5: What is the difference between mast section height and traveling height?
A5: Mast section height is most used and it is indicated by mast section number.
For example: 50m mast section height need 33 pieces mast sections (33*1.508=49.76)
 
Traveling height means the travel distance of cage from the ground to the bottom of cage. It is normally about 7.5m less than mast section height.
Q6: What is your trade items of construction hoist?
Qingdao or Shanghai or according to Clients' need. We could accept 1 set of our products as your trial order.
 
If any question about construction hoist, please feel free to contact us. We are waiting for you!
 

 

Photos for 20m-150m Height SC200 Hoisting Equipment with Rack and Mast in Construction

 

 

 

 

 

 

 

Hot Products

High Quality 1ton Single Cage Construction Elevator of Construction Building Hoist Specifications ...
1 ton One Cage Material and Passenger Lifting Hoist for Building Construction Our Skilled Team Our R...
One Cage 1000KG Material and Passenger Hoisting Equipment in Construction Our Skilled Team Our R&D ...
SC100 One Cage 1000KG Material and Passenger Temporary Construction Elevators Our Skilled Team Our R...
20m-150m Height SC200 Hoisting Equipment with Rack and Mast in Construction All kinds of spare parts ...
SC200 Single Cage 650*650*1508mm Mast Man Material Hoist for Building Construction All kinds of ...