Home Companies Yong Xing Boiler Group Co.,Ltd

10 Bar Gas Fired Hot Water Boiler Oil steam Boiler Heating System

Yong Xing Boiler Group Co.,Ltd
Active Member

Contact Us

[China] country

Address: Develop area,Taikang County,Zhoukou City,Henan PR,China

Contact name:Bettysun

Inquir Now

Yong Xing Boiler Group Co.,Ltd

10 Bar Gas Fired Hot Water Boiler Oil steam Boiler Heating System

Country/Region china
City & Province zhoukou henan
Categories Boilers
InquireNow

Product Details

10 Bar Gas Fired Hot Water Boiler Oil steam Boiler Heating System


WNS2-1.25-YQ oil-fired steam boiler technical data sheet

TECHNICAL ITEMWNS2-1.25-YQ
Rated evaporation2T/h
Rated steam pressure MPa1.25
Rated steam temperature °C194
Feed water temperature °C20
Heat transfer area m275.9
Design thermal efficiency%91-94
Testing thermal efficiency≥90
Water test pressure MPa1.65
Boiler net weight T7.09
Water capacity KG4200
Air consumption (natural gas)120Nm3/h
Air consumption (city gas)300Nm3/h
Motor KW4.5
Shipping size (length X width x height) m4.2x2.2x2.4
Steam interface PN1.6Mpa
Steam interface DN80mm
Air supply port (natural gas) mmDN65
Air supply port (city gas) mmDN65
Sewage outlet DN50mm
Safety valve PN1.6Mpa
Nominal diameter DN (mm)2x40
Chimney diameter360mm
Natural gas (pressure) mmH20600
City gas (pressure) mmH201000


Our company will guide the installation and testing of the boilers sold by one or two engineers according to customer needs. The installation cycle has a small capacity boiler for 7-15 days and a large capacity boiler for 15-20 days.

During the period, the customer is responsible for the engineer's visa, airfare, accommodation, food, and salary of $80/day/person.

 

Main process of boiler installation China for reference
1. Before the boiler put into use or within 30 days after put into use, the unit for the use of special equipment shall register with the special equipment safety supervision and administration department of the municipality directly under the central government or the city where the district is located. The registration mark should be placed or attached to a prominent location on the special equipment.
2. After the completion of the installation, transformation and maintenance of the boiler, the construction unit that installs, renovates or repairs shall hand over the relevant technical data to the user within 30 days after acceptance.
3. The construction unit that installs, renovates and repairs the boiler shall inform the municipal special equipment safety supervision and management department of the municipality or the district where the project is to be carried out before the construction.
4. The production license system shall be implemented for the design, manufacture, installation, modification, inspection, and testing of boilers.
5. The location of the boiler should be at the lower air outlet of the plant with the most wind direction in the year.
6. Steam boiler products must be accompanied by technical information related to safety when they leave the factory. The contents should include:
1. Boiler drawings (including general drawings, installation drawings, and main pressure-receiving parts drawings);
2. The strength calculation book or calculation result in a summary table of the pressure component;
3. A summary of the calculation book or calculation results of the safety valve emissions;
4. Boiler quality certificate (including factory certificate, metal material certificate, welding quality certificate, and hydraulic test certificate);
5. Boiler installation instructions and instructions for use;
6. Major design change data for pressure components.

Boiler applicable industries: hot spring bath, sauna steam room, printing and dyeing textile, factory office school, medical and pharmaceutical, hotel catering, food processing, chemical plant, socks factory heat setting, garment processing, industrial steam washing, farm heating and drying, etc.

Hot Products

Customized 0.3-4t/h electric heating boiler for school and hotel with CE/ISO approved Product ...
Best Manufacturer 0.7/1/1.25/1.6/2.5MPa electric heater for industrial application Features: 1, ...
Natural circulation Industrial Use Natural Gas Fired Steam Boiler for Hot Spring Bath Hot Spring ...
High efficiency 8 ton oil fired steam boiler Main features of oil fired steam boiler: Boiler ...
10 Bar Gas Fired Hot Water Boiler Oil steam Boiler Heating System WNS2-1.25-YQ oil-fired steam ...
WNS 5 ton Industrial Oil fired Steam Boiler Protective Device PLC Control Horizontal Our Oil fired ...