Suzhou Hengxie Machinery Co., Ltd |
|
HXE-400/13DL Copper rod breakdown machine with continuous annealer
I. Quick Description
HXE-400/13DL Copper rod breakdown machine with continuous annealer is used to draw and anneal single bare copper wire from 8mm to 1.2mm-3.5mm.The drawing capstans are arranged in a line that are able to work continuously with drawing speed and electrical control can be matched with each other.
II. Compositions of equipment
Name | Quantity |
1. Pay-off shelf | 1 |
2. HXE-400/13DL Main drawing machine | 1 |
3. HXE-TH450 Annealing machine | 1 |
4. HXE-180 Tension controller | 1 |
5. HXE-SX500/630 Double spoolers | 1 |
6. HXE-WF750 Coiler & Basket changer system | 1 |
7. Electrical cabinet | 1 |
8. Gear Oil Cooler and Pump | 2 |
9. Operation panel / With PLC&Touching screen | 1 |
10. Spare parts |
III. Main technical parameters
1. Inlet | 8mm |
2. Outlet | 1.2mm-3.5mm |
3. Diameter of capstans | 400mm |
4. Speed | 1000m/min, Capacity say 1.2mm, 600kg per hour |
5. Slip ratio | 1.238 |
6. Quantity of capstan | 13 |
7. Capstan | Tungsten carbide |
8. Quick dies change | Available |
9. Main motor | DC 200KW |
10. Fix speed motor | DC 55KW |
11. Gear | Not Changeable |
12. Noises of machine | ≤85 db |
13. Protection cover | Installed |
14. Lubrication system | 1 set |
IV. Advantage and after-self service
A: Advantage
(1). HENGXIE has some world famous parts suppliers, has special lubrication system for the gears and bearing.
(2). Body and other key components and parts are produced by our own factory , quality is reliable.
(3). DC. three-section annealing
(4). Our company’s developing process in more than 10 years.
B: After-self service
Our company for all machine product, since the shipment date, our company free after sale maintenance service guarantee period is:
(1) 1 year for mechanical part.
(2) 6 month for electrical part.
V. Lifting the machine, installation, adjustment
5-1. Lifting, there are four lifting rings to lift.
5-2. Installation, please check the external drawing and foundation drawing of the machine, dig the ground, put the machine in position, check the horizontal level, adjust the ground screws, put concrete slurry, after dry and fix, check the horizontal level again, then fix the machine by the ground screws.
5-3. Adjustment, clean all parts, check all the part no loose.
VI. Preparation before working
6-1. Check all parts lubrication conditions,
6-2. Check drawing lubrication oil, cooling water, steam, air pressure.
6-3. After checking, connect to power, according to the Electrical drawing, use foot switch, to make the machine operating in low speed (under 4m/s), if no Abnormal, then can begin to work.