Suzhou Hengxie Machinery Co., Ltd |
|
HXE-WF 800 Coiler for rod breakdown machine
I. Application
WF800 coiler for rod breakdown machine is used to take up wire from 1.2mm to 3.0mm.
II. Main technical parameter
1. Applicable diameter 1.2mm-3.0mm
2. Motor AC 22kw, Speed 1500m/min, adjustable
3. Coiler basket size 800mm
4. Small electric cabinet, 1 set, to connect with the drawing machine control system
5. Tension device required, if your drawing machine has Tension device, then no need.
6. Traverse motor AC 1.5kw
7. Speed reduction motor 90w
8. Speed control by Inverter 22kw
9. Air compressor shall be needed during work
10. Basket changing system is equipped
11. Basket block device is equipped
11. All ladders and blockers (Yellow parts) (Screws to fix) will be removed before shipping
12. The machine is a whole piece to achieve running in high speed without shake
13. Needs connection wires from the Coiler to the drawing machine control system
III. Attention
3-1. If wire breaks, will stop automatically, and the Fault Indicator light will open.
After connect the wire, press the Fault Reset button(Yellow button) and the On button (Green button), to run the machine again.
3-2. Press Emergency Stop button(Red button) to shut down the machine immediately.
After solve, press the button again to run the machine.
3-3. After set the Length-counter, the machine will stop automatically when reach the length set.
After change the Spool, please press the Length Reset button(Yellow button) and the Spool Reset button(Yellow button) to run the machine again.
3-4. After the machine stop(no running at all), then switch the Pump switch to stop the lubrication.
3-5. Do not touch the wire in the Annealing section.
3-6. After shut down the machine, need at least 30 seconds to restart the machine.
3-7. Wire often breaks, adjust the speed, balance arm, check the dies are clean or not.
3-8. If has scratch on the surface of the wire, check the capstans on the Take-up part. Check the drawing capstans.
IV. Machine maintenance and precautions
1. Make sure the machine and the capstans clean, no scrap, no break wire.
2. Make sure the Take-up part clean.
3. Electrical cabinet should be closed.
4. Change belts if worn out.
5. Only qualified electrical technician can repair the electrical part.
6. Never change the Inverter parameter.
7. If something wrong with the machine that can`t solve, please contact the supplier first.
Do not open the machine without consulting to the supplier.
8. Put lubrication oil to the parts regularly, to make sure all parts running fluently. After running 1000 hours, clean all the bearings.
9. Annealed nickel belt and Annealing carbon brush are consuming parts. If spark happens a lot on the annealing capstans, then should change the nickel belt. If the carbon is going to run out, then need to change a new set.
V. Advantage and after-sale service
A: Advantage
(1). HENGXIE has some world famous parts suppliers, has special lubrication system for the gears and bearing.
(2). Body and other key components and parts are produced by our own factory , quality is reliable.
(3). Our company’s developing process in more than 10 years.
B: After-self service
Our company for all machine product, since the shipment date, our company free after sale maintenance service guarantee period is:
(1) 1 year for mechanical part.
(2) 6 month for electrical part.